BLD-Final | 8/29/2007 | 8/30/2007 | 8/30/2007 | A | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Internet Inspection Request from: James MacIsaac
|
DOC - Permit Finaled | 8/30/2007 | 8/30/2007 | 8/30/2007 | P | PASS |
Jim Storey
|
|
|
|
Code Occupancy Approval | | | 8/29/2007 | | DONE |
|
|
|
Meets DRH06-00141
|
BLD-Foundation | 6/6/2007 | 6/7/2007 | 6/7/2007 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 6/6/2007 at 10:34:13 PM. Contact: ###-####.
|
BLD-Footing | 6/5/2007 | 6/5/2007 | 6/5/2007 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 6/5/2007 at 7:44:40 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 4/26/2007 | 4/27/2007 | 4/27/2007 | A | PASS |
Jim Storey
|
|
|
James; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
|
BLD-Framing/Rough-in | 4/17/2007 | 4/18/2007 | 4/18/2007 | A | FAIL |
Dave Hannah
|
|
|
james; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles c/n items rebuild stairs, fire blocking of fur downs, need arc to look at how they are insulating the roof/ceiling becouse of lack of ventalion , point loads at flooor line ok to insulate
|
BLD-Foundation | 2/26/2007 | 2/27/2007 | 2/27/2007 | A | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 2/26/2007 at 10:47:53 PM. Contact: ###-####.
|
BLD-Footing | 2/22/2007 | 2/23/2007 | 2/23/2007 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 2/22/2007 at 8:39:23 PM. Contact: ###-####.
|