BLD-Final | 5/1/2008 | 5/1/2008 | 5/1/2008 | P | PASS |
Mike Jordan
|
|
|
ray Phone #: ###-####
|
DOC - Permit Finaled | 5/1/2008 | 5/1/2008 | 5/1/2008 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Energy code compliance | 4/7/2008 | 4/7/2008 | 4/7/2008 | P | PASS |
Mike Jordan
|
|
|
Ray; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt. All framing issues resolved, received paperwork from floor manufacturer noting that no repair is required to damaged floor joist.
|
BLD-Framing/Rough-in | 4/4/2008 | 4/4/2008 | 4/4/2008 | A | FAIL |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 4/4/2008 at 6:24:47 AM. Contact: ###-####. Airseal package completed. Needs to provide engineered fix for cut top chord on floor joist, justify deletion of box header at over head garage door. Also needs to provide more attic ventilation, i.e. roff vents and baffeles in each truss bay. c/n posted, ok to insul.
|
BLD-Framing/Rough-in | 4/3/2008 | 4/3/2008 | 4/3/2008 | P | FAIL |
Mike Jordan
|
|
|
ray Phone #: ###-####. Air seal package not completed. c/n posted. not ok to cover.
|
BLD-Foundation | 3/25/2008 | 3/25/2008 | 3/25/2008 | A | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 3/25/2008 at 5:40:26 AM. Contact: ###-####.
|
BLD-Footing | 3/24/2008 | 3/24/2008 | 3/24/2008 | P | PASS |
Mike Jordan
|
|
|
amy Phone #: ###-####
|
BLD-Footing | 3/21/2008 | 3/21/2008 | 3/21/2008 | P | CANC |
Tony Young
|
|
|
amy Phone #: ###-####
|
BLD-Footing | 3/20/2008 | 3/20/2008 | 3/20/2008 | P | CANC |
Mike Jordan
|
|
|
dane Phone #: ###-####
|
BLD-Framing/Rough-in | 6/28/2007 | 6/28/2007 | 6/28/2007 | P | CANC |
Mike Jordan
|
|
|
MEL Phone #: ###-####
|