BLD-Final | 8/3/2007 | 8/6/2007 | 8/6/2007 | P | PASS |
Jim Sly
|
|
|
dave Phone #: ###-#### C/C issued
|
DOC - Permit Finaled | 8/6/2007 | 8/6/2007 | 8/6/2007 | P | PASS |
Jim Sly
|
|
|
|
DOC - Permit Finaled | 8/6/2007 | 8/6/2007 | 8/6/2007 | P | PASS |
Jim Sly
|
|
|
|
FIRE-Final Inspection | 8/3/2007 | 8/3/2007 | 8/6/2007 | P | PASS |
Troy Cobbley
|
|
|
life safety passed
|
FIRE-Final Inspection | 8/3/2007 | 8/6/2007 | 8/6/2007 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
FIRE-Final Inspection | 8/1/2007 | 8/1/2007 | 8/1/2007 | P | FAIL |
Troy Cobbley
|
|
|
Life safety will be ok to pass when the fire sprinkler permit is finaled
|
BLD-Final | 7/26/2007 | 7/26/2007 | 7/26/2007 | P | NR |
Tony Young
|
|
|
david; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang need fire l s,, and sprinklers 1st,, t/w cont to this effect
|
BLD-Framing/Rough-in | 3/29/2007 | 3/29/2007 | 3/29/2007 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 3/29/2007 at 8:23:47 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 3/9/2007 | 3/9/2007 | 3/9/2007 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 3/9/2007 at 9:36:44 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 3/6/2007 | 3/7/2007 | 3/7/2007 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 3/6/2007 at 4:08:47 PM. C/N continuity of gyp at 1hr corridor walls
|