BLD-Energy code compliance | 11/6/2007 | 11/6/2007 | 11/6/2007 | P | PASS |
Tom Arcoraci
|
|
|
ernie Phone #: ###-####
|
BLD-Framing/Rough-in | 11/5/2007 | 11/5/2007 | 11/5/2007 | P | PASS |
Tom Arcoraci
|
|
|
ernest Phone #: ###-####
|
BLD-Footing | 8/2/2007 | 8/3/2007 | 8/3/2007 | A | PART |
Jim Sly
|
|
|
brodie - pour time is 10:00 Phone #: ###-####
|
BLD-Footing | 7/10/2007 | 7/11/2007 | 7/11/2007 | A | PASS |
Tom Arcoraci
|
|
|
###-#### brody- contractor to provide engineering to inspector at time of inspection per Bob Archibald
|
BLD-Other | 5/9/2007 | 5/10/2007 | 5/10/2007 | A | FAIL |
Tom Arcoraci
|
|
|
Place a SWO on this project. Work not to proceed until structure meets required setbacks. Per Bob A.. SWO POSTED BY 408
|
BLD-Other | 5/9/2007 | 5/9/2007 | 5/9/2007 | P | FAIL |
Tom Arcoraci
|
|
|
Phone conference with Erin Christopherson @ ###-####. Informed Erin that structure had to meet required setbacks and to relocate the structure a minimum of three feet from property line with removal of 2nd story pop-outs or 5 feet from property line if he wished to retain the pop-outs.
|
BLD-Foundation | 4/25/2007 | 4/25/2007 | 4/25/2007 | P | DONE |
Tom Arcoraci
|
|
|
###-#### the distance between this house and the one to the east of it is 7 feet it appears that 6219 york has a 8 ft set back on the west side and a 2ft set back on the east side must see plan reveiw and zoning for approval
|
BLD-Footing | 3/1/2007 | 3/2/2007 | 3/2/2007 | A | PASS |
Tom Arcoraci
|
|
|
Rody; Phone #: ###-#### Internet Inspection Request from: Stacie Backus
|