Information based on query as of Wednesday, June 26, 2024.
Permit Information
Permit NumberBLD07-00175
StatusFinaled
Name PUBLICOVER CONST CO
Site Address 2939 S GOSHEN WAY
Project Name 
Customer Number 
ePlanReviewNo
Description
9/6/07-UNFINISHED BATHROOM WILL REQUIRE ADDITIONAL PERMITS OK TO FINAL PER PERRY PAINE This project is for the addition of 1024s.f.of upper level to an existing 2182s.f. 1-story single family dwelling. The new upper level is to be over the garage area new stairway and the removal of select interior partitions to create a new office area in place of 2-existing bedrooms on the main level. R-1B ok per Sue Hansen. Separate electrical, plumbing and mechanical permits are required. All per the approved plans as marked REScheck, Engineering calculations and details along with the plan revoew notes. pep
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final9/19/20079/21/20079/21/2007PPASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 9/19/2007 at 1:42:06 PM. Contact: ###-####.
DOC - Permit Finaled9/21/20079/21/20079/21/2007PPASS
DetailsMike Jordan
BLD-Final9/12/20079/13/20079/13/2007PNR
DetailsMike Jordan
Scheduled by a contractor via Hello! on 9/12/2007 at 8:54:12 AM. Contact: ###-####. Still Needs to have been permit finaled as ri only.
BLD-Energy code compliance5/21/20075/22/20075/22/2007PPASS
DetailsMike Jordan
kevin; Phone #: ###-#### Internet Inspection Request from: Delphine Kavanaugh
BLD-Framing/Rough-in5/10/20075/11/20075/11/2007APASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 5/10/2007 at 9:08:37 AM.
BLD-Energy code compliance5/9/20075/10/20075/10/2007AFAIL
DetailsMike Jordan
kevin Note: please call 1/2 hr prior to inspection; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Needs mech ri insp. No truss engineering on site. Willl call back for framing insp. tomorrow.
BLD-Conference2/28/20072/28/20072/28/2007PPART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 2/28/2007 at 10:44:49 AM. Contact: ###-####. Framing insp at new stairs. energy code ok. ok to cover.
BLD-Conference2/19/20072/20/20072/20/2007APART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 2/19/2007 at 6:58:10 AM. Contact: ###-####. ok to insulate at floor joist.
BLD-Footing2/2/20072/2/20072/2/2007APASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 2/2/2007 at 6:47:36 AM. Contact: ###-####. Intereior column pad footings in garage. Noted new engineering bdeleting the center column pad footing.