BLD-Final | 2/28/2007 | 2/28/2007 | 2/28/2007 | P | PASS |
Tom Arcoraci
|
|
|
Brian; Phone #: ###-#### Internet Inspection Request from: Stacie Backus
|
DOC - Permit Finaled | 2/28/2007 | 2/28/2007 | 2/28/2007 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Final | 2/27/2007 | 2/28/2007 | 2/28/2007 | A | NH |
Tom Arcoraci
|
|
|
brian; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
|
BLD-Framing/Rough-in | 2/15/2007 | 2/16/2007 | 2/16/2007 | A | PART |
Mike Jordan
|
|
|
brian ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith. Front bedroom only. Energy code also ok. homeowner noted that bathroom work portion of permit is on hold. Noted to homeowner that he may want to have permit ammended if remainder of work is giong to be postponed for extended period of time.
|
BLD-Conference | 2/6/2007 | 2/7/2007 | 2/7/2007 | A | DONE |
Jim Sly
|
|
|
bryan; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|