BLD-Final | 11/19/2007 | 11/19/2007 | 11/19/2007 | P | PASS |
Mike Jordan
|
|
|
|
DOC - Permit Finaled | 11/19/2007 | 11/19/2007 | 11/19/2007 | P | PASS |
Mike Jordan
|
|
|
All issues resolved.
|
BLD-Final | 11/15/2007 | 11/16/2007 | 11/16/2007 | A | FAIL |
Mike Jordan
|
|
|
jerry Note: please 30 prior to inspection Phone #: ###-####. Provide returns on handrails and mount at proper heights.
|
BLD-Framing/Rough-in | 4/26/2007 | 4/26/2007 | 4/26/2007 | P | PART |
Mike Jordan
|
|
|
Steve; Phone #: ###-#### Internet Inspection Request from: Victoria Beall. All previous framing issues resolved. Noted that window at top of stairway needs to be tempered and a guardrail at top of stairs will be required. c/n posted, contractor was notified, gave ok to cover framing, will check remasining items at final.
|
BLD-Framing/Rough-in | 4/20/2007 | 4/20/2007 | 4/20/2007 | P | FAIL |
Jim Storey
|
|
|
Steve Detached garage; Phone #: ###-#### Internet Inspection Request from: Stacie Backusc/n on site.
|
BLD-Foundation | 4/12/2007 | 4/12/2007 | 4/12/2007 | P | DONE |
Mike Jordan
|
|
|
Bob; Phone #: ###-#### Internet Inspection Request from: Stacie Backus. Stemwalls were already placed when on site.
|
BLD-Footing | 4/10/2007 | 4/11/2007 | 4/11/2007 | A | PART |
Mike Jordan
|
|
|
Bob; Phone #: ###-#### Internet Inspection Request from: Stacie Backus. wip. Footings for patio cover.
|
BLD-Foundation | 3/29/2007 | 3/30/2007 | 3/30/2007 | A | PASS |
Mike Jordan
|
|
|
Dave; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
|
BLD-Footing | 3/28/2007 | 3/29/2007 | 3/29/2007 | A | PASS |
Mike Jordan
|
|
|
Dave Preferrably 11:00; Phone #: ###-#### Internet Inspection Request from: Stacie Backus
|