BLD-Final | 7/13/2007 | 7/16/2007 | 7/16/2007 | A | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 7/16/2007 at 7:19:11 AM. wip.
|
FIRE-Final Inspection | 7/12/2007 | 7/13/2007 | 7/13/2007 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed.
|
FIRE-Final Inspection | 7/11/2007 | 7/12/2007 | 7/12/2007 | A | FAIL |
Troy Cobbley
|
|
|
Repair exit sign in the store room, provide earthquake bracing on the new sprig up in the store room and provide approved hardware on the restroom door. The smoke evac system and the duct detector performed as required.
|
BLD-Framing/Rough-in | 7/10/2007 | 7/11/2007 | 7/11/2007 | A | PASS |
Mike Jordan
|
|
|
buddy - ceiling cover; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang. ceiling grid ok, pend. mech. 1 hr wall ok, received UL and flame spread data for OSB interior finish.
|
BLD-Framing/Rough-in | 6/20/2007 | 6/20/2007 | 6/20/2007 | P | PART |
Mike Jordan
|
|
|
Interior framed walls and storefront only. Needs UL from architect.
|
BLD-Framing/Rough-in | 6/19/2007 | 6/19/2007 | 6/19/2007 | P | NR |
Mike Jordan
|
|
|
buddy - please call 1/2 hr prior to inspection Phone #: ###-####. Needs other trades.
|
BLD-Framing/Rough-in | 6/15/2007 | 6/18/2007 | 6/18/2007 | A | NR |
Mike Jordan
|
|
|
buddy ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith. Needs ri insp. tried calling contractor, phone # is not valid. No access.
|
DOC - Permit Finaled | 6/18/2007 | 6/18/2007 | 6/18/2007 | P | PASS |
Mike Jordan
|
|
|
|