BLD-Final | 6/28/2007 | 6/29/2007 | 6/29/2007 | P | PASS |
Tony Young
|
|
|
Larry; Phone #: ###-####
|
DOC - Permit Finaled | 6/29/2007 | 6/29/2007 | 6/29/2007 | P | PASS |
Tony Young
|
|
|
c of c issued
|
BLD-Grading Inspection | 6/29/2007 | 6/29/2007 | 6/29/2007 | | BOND |
|
|
|
The rough grading and drainage has been completed at the above mentioned address. However, revegetation has not been completed. For this the engineer has recommended a bond of $500.00. Upon receipt of this bond the grading and drainage is conditionally approved.
|
BLD-Final | 6/28/2007 | 6/28/2007 | 6/28/2007 | P | NR |
Tony Young
|
|
|
larry Phone #: ###-#### need hill side 1st
|
BLD-Framing/Rough-in | 5/21/2007 | 5/21/2007 | 5/21/2007 | P | PART |
Tony Young
|
|
|
larry; Phone #: ###-#### Internet Inspection Request from: Delphine Kavanaugh
|
BLD-Energy code compliance | 5/16/2007 | 5/17/2007 | 5/17/2007 | P | PART |
Tony Young
|
|
|
LARRY; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles seal pack ok
|
BLD-Framing/Rough-in | 5/16/2007 | 5/17/2007 | 5/17/2007 | P | PART |
Tony Young
|
|
|
LARRY; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok to insulate after mech is signed off
|
BLD-Framing/Rough-in | 5/9/2007 | 5/11/2007 | 5/11/2007 | A | NR |
Tony Young
|
|
|
larry ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith conf only,, need letter from eng on pier ftgs,, need trades 1st on frame,, ext shear not looked at,, did spot checks,, appears ok
|
BLD-Foundation | 4/12/2007 | 4/12/2007 | 4/12/2007 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 4/12/2007 at 9:53:16 AM. Contact: ###-####. walls ok,, still need pier pads
|
BLD-Footing | 4/5/2007 | 4/6/2007 | 4/6/2007 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 4/5/2007 at 12:40:01 PM. Contact: ###-####. need to raise grade in one area,, then ok
|