Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD07-00623
StatusFinaled
Name ST LUKES REG MED CNTR
Site Address 190 E BANNOCK ST
Project NameST LUKES
Customer Number27-230
ePlanReviewNo
Description
(ST LUKES - 3RD FLR SOUTH WING - CATH LAB REMODEL) This building is fully sprinklered based on occupancy use. To remodel an 822 sq. ft. area currently used as Cardiac Catheterization Lab to continue use as a Cath. Lab. Work includes select interior demolition; relocate / build walls and windows; install new openings for support & operation of electrical, mechanical & plumbing for the newly installed healthcare equipment; to install support structure at concrete floor and concrete ceiling per structural engineering and manufacture's instructions; upgrade / provide radiation shield at surrounding walls, doors and electrical boxes; install lighting fixtures and controls, ductwork, millwork, ceiling grid elements and finishes, all per approved plans. drs
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/27/20078/27/20078/27/2007PPASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 8/27/2007 at 6:43:39 AM.
DOC - Permit Finaled8/27/20078/27/20078/27/2007PPASS
DetailsTom Arcoraci
BLD-Final8/22/20078/23/20078/24/2007ACANC
DetailsDave Hannah
Scheduled by a contractor via Hello! on 8/22/2007 at 2:26:43 PM. Contact: ###-####.
FIRE-Alarm Testing8/22/20078/23/20078/23/2007APASS
DetailsForrest France
Request intended for fire life safety final. Fire life safety is acceptable, need to install smoke seal at the door prior to structural final-to be completed when door frame paint is finished per contractor.
BLD-Final8/15/20078/17/20078/20/2007AFAIL
DetailsDave Hannah
Scheduled by a contractor via Hello! on 8/15/2007 at 2:37:48 PM. Contact: ###-####.needs fire sign offs first
FIRE-Alarm Testing8/15/20078/17/20078/17/2007AFAIL
DetailsForrest France
Intended for life safety final which is not ready at this time, the project related fire alarm permit has been completed and finaled.
BLD-Wall cover7/24/20077/25/20077/25/2007APASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 7/24/2007 at 1:15:04 PM. Contact: ###-####.
BLD-Aging Inspection7/10/20077/10/20077/13/2007 PASS
DetailsDave Hannah