BLD-Final | 2/16/2010 | 2/16/2010 | 2/16/2010 | P | CANC |
Jim Sly
|
|
|
John- Phone #: ###-#### c/c issued
|
DOC - Permit Finaled | 2/16/2010 | 2/16/2010 | 2/16/2010 | P | PASS |
Jim Sly
|
|
|
|
BLD-Aging Inspection | 2/10/2010 | 2/10/2010 | 2/16/2010 | | CANC |
Jim Sly
|
|
|
Sched final for PM
|
BLD-Final | 7/14/2009 | 7/14/2009 | 7/14/2009 | P | NR |
Jim Sly
|
|
|
Phone #: ###-#### Need to complete stairs (ext.) and fix handrails at interior stairs.
|
BLD-Conference | 7/6/2009 | 7/7/2009 | 7/7/2009 | A | CANC |
Jim Sly
|
|
|
michael - please call 1/2 hr prior Phone #: ###-#### No one here ...Called John and discussed stair issues.
|
BLD-Conference | 6/11/2008 | 6/12/2008 | 6/12/2008 | A | DONE |
Jim Sly
|
|
|
Talked to Jon......Still working on house....just put in ditch pipe and gravel in drieway.
|
BLD-Conference | 6/11/2008 | 6/11/2008 | 6/11/2008 | P | CANC |
Jim Sly
|
|
|
Call ......
|
BLD-Footing | 8/8/2007 | 8/9/2007 | 8/9/2007 | A | PASS |
Jim Sly
|
|
|
joe Phone #: ###-####
|
BLD-Framing/Rough-in | 7/9/2007 | 7/9/2007 | 7/9/2007 | P | PART |
Jim Sly
|
|
|
joe - concrete wall; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang Basement (concrete) wall OK
|
BLD-Footing | 6/21/2007 | 6/22/2007 | 6/22/2007 | A | PASS |
Jim Sly
|
|
|
joe - pour time is 9:30 am Phone #: ###-####
|