Information based on query as of Friday, July 5, 2024.
Permit Information
Permit NumberBLD07-00711
StatusFinaled
Name CM COMPANY
Site Address 1010 W WASHINGTON ST
Project NameBOISE HIGH SCHOOL
Customer Number 
ePlanReviewNo
Description
(BOISE HIGH SCHOOL - INTERIOR DEMO - 3RD FLR) To perform interior demolition of the interior walls and a portion of the ceiling and subfloor in a specific unoccupied area of the 3rd floor to prepair for future remodel and upgrade per approved plans. Required inspection by PDS Fire to verify ceiling insulation is secured in place per Sam Rogers (see ltr attached to documents of this permit). No new construction under this permit. Fire sprinkler system must remain fully operational as reviewed and approved by PDS Fire. (mys)
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection9/1/20109/1/20109/2/2010 DONE
DetailsTony Young
DOC - Permit Finaled9/2/20109/2/20109/2/2010PPASS
DetailsTony Young
BLD-Aging Inspection6/29/20106/29/20107/1/2010 FAIL
DetailsTony Young
BLD-Aging Inspection4/29/20104/29/20104/30/2010 PEND
DetailsTony Young
FIRE-Final Inspection4/30/20075/1/20075/1/2007APASS
DetailsForrest France
Insulation install is acceptable, noted one small area to be retaped, also need to remove the construction dust covers at four smoke detectors during the interm period until new construction begins.