BLD-Final | 4/13/2007 | 4/13/2007 | 4/13/2007 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 4/12/2007 at 3:14:36 PM. Contact: ###-####. ok for perm occ
|
BLD-Final | 4/12/2007 | 4/13/2007 | 4/13/2007 | A | CANC |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 4/12/2007 at 3:14:36 PM. Contact: ###-####. out of time resch for pm
|
FIRE-Final Inspection | 4/12/2007 | 4/13/2007 | 4/13/2007 | A | PASS |
Forrest France
|
|
|
c/n items complete, fire life safety passed inspection.
|
Permanent Occupancy | | 4/13/2007 | 4/13/2007 | | DONE |
|
|
|
|
FIRE-Final Inspection | 4/12/2007 | 4/12/2007 | 4/12/2007 | P | FAIL |
Forrest France
|
|
|
Need to repair one exit sign/emergency light combo at the south exit.
|
BLD-Framing/Rough-in | 4/6/2007 | 4/6/2007 | 4/6/2007 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Framing/Rough-in | 4/5/2007 | 4/6/2007 | 4/6/2007 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 4/5/2007 at 3:59:12 PM. Contact: ###-####.ok to cover
|