BLD-Final | 8/22/2007 | 8/23/2007 | 8/24/2007 | P | PASS |
Dave Hannah
|
|
|
chuck Phone #: ###-####
|
DOC - Permit Finaled | 8/24/2007 | 8/24/2007 | 8/24/2007 | A | PASS |
Dave Hannah
|
|
|
|
FIRE-Final Inspection | 8/22/2007 | 8/23/2007 | 8/23/2007 | A | PASS |
Forrest France
|
|
|
Fire life safety is acceptable pending the addition of two PFE's on the mezzanine level, also need to blank keyed locks above the panic hardware, these two items shall be completed prior to structural final-verified at that time.
|
FIRE-Final Inspection | 8/21/2007 | 8/22/2007 | 8/22/2007 | A | FAIL |
Forrest France
|
|
|
Need project related fire alarm and sprinkler permits finaled prior to BLD life safety approval, noted door hardware at two exit locations is incorrect, discussed EM lighting, FA and FS permit issues.
|
BLD-Final | 8/20/2007 | 8/21/2007 | 8/21/2007 | P | NR |
Tom Arcoraci
|
|
|
Chuck; Phone #: ###-#### Internet Inspection Request from: Hattie James; call prior to appointment
|
BLD-Framing/Rough-in | 7/26/2007 | 7/26/2007 | 7/26/2007 | P | PASS |
Dave Hannah
|
|
|
ivan Note covering Phone #: ###-####
|
BLD-Conference | 6/13/2007 | 6/14/2007 | 6/14/2007 | P | PASS |
Dave Hannah
|
|
|
chuck ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
|