Permit Information
Permit NumberBLD07-00900
StatusFinaled
Name BOISE CITY HOUSING & COMMUNITY DEV
Site Address 2717 S VISTA AVE
Project NameBoise City Housing/up-grade
Customer Number 
ePlanReviewNo
Description
Boise City Housing & Community Development * The work encompassed in this permit is as described below and is used to replace an existing upgrade agreement requiring fire sprinklers throughout this building as noted in BLD 03-02560. This permit requires the installation of one-hour fire barriers and one-hour horizontal assemblies, to separate the existing lobby and the police substation area from the remainder of this building. To repair and replace as required for the type of construction: one-hour fire-resistive assemblies for bearing walls, for exterior walls, for floor/ceilings and for roof/ceilings in this area. To install a new exterior stair as shown on sheets A3.2 and A3.3, to replace the interior stair that was previously removed in the earlier remodel. To repair the existing, exterior stairs on the north side of this building. All construction shall be per the approved plans and attached comment list. MJP
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/19/200711/20/200711/20/2007APASS
DetailsTom Arcoraci
kevin Phone #: ###-####
DOC - Permit Finaled11/20/200711/20/200711/20/2007PPASS
DetailsTom Arcoraci
FIRE-Final Inspection11/15/200711/19/200711/19/2007PPASS
DetailsForrest France
Correction notice items completed, life safety finaled.
BLD-Final11/15/200711/19/200711/19/2007PNR
DetailsTom Arcoraci
Kevin, please arrange to meet w/Forrest , per his request at this job for a conference, would like to meet around 2:00 w/archt.; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
FIRE-Final Inspection10/25/200710/26/200710/26/2007AFAIL
DetailsForrest France
Two exit stairways as indicated on the scope of work are not yet complete, provide one PFE for the 2nd floor hall/ mech. room area, repair exit signs and existing EM lights on the 1st floor, provide approved hardware at the RR doors, install exit signs for the first floor office area as discussed.
BLD-Conference10/24/200710/24/200710/24/2007PPASS
DetailsTom Arcoraci
kevin Phone #: ###-#### sec 1009.3.1 ok for use at ext stairs