FIRE-Final Inspection | 9/23/2008 | 9/23/2008 | 9/24/2008 | P | PASS |
Forrest France
|
|
|
Fire life safety finaled.
|
DOC - Permit Finaled | | | 9/24/2008 | | DONE |
Barbara Stitt
|
|
|
|
FIRE-Alarm Testing | 9/22/2008 | 9/23/2008 | 9/23/2008 | A | PASS |
Forrest France
|
|
|
Verified corrections are complete, one exit sign battery to be repaired today as agreed.
|
BLD-Final | 9/22/2008 | 9/23/2008 | 9/23/2008 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 9/22/2008 at 9:15:18 AM. Contact: ###-####. ok for perm occ
|
FIRE-Alarm Testing | 8/5/2008 | 8/6/2008 | 8/6/2008 | A | FAIL |
Forrest France
|
|
|
Provide missing EM lights and exit signs at both vestibules on the north side of the auditoriums, also need to post max. occupant load signs per review notes.
|
BLD-Final | 7/29/2008 | 7/30/2008 | 7/30/2008 | A | NR |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 7/29/2008 at 10:47:13 AM. Contact: ###-####.
|
BLD-Final | 7/11/2008 | 7/14/2008 | 7/15/2008 | P | DEFR |
Dave Hannah
|
|
|
Dave- please verify this project is done so I can close--thanks barb Phone #: ###-#### will get fire done first
|
FIRE-Final Inspection | 7/11/2008 | 7/14/2008 | 7/14/2008 | A | DEFR |
Troy Cobbley
|
|
|
I spoke to curtis at ###-#### and he stated that they were working with dave hanna on getting multiple permits cleaned up and this one should be done in the next couple of days. I told him to please involve forrest france.
|
BLD-Aging Inspection | 9/5/2007 | 9/5/2007 | 9/10/2007 | | PASS |
Dave Hannah
|
|
|
|