BLD-Final | 4/30/2018 | 5/1/2018 | 5/1/2018 | A | DONE |
Tony Young
|
|
|
Ted-GC called not owner Phone #: ###-####, meets code at this point,, railing is being built
|
BLD-Final | 4/26/2018 | 4/30/2018 | 4/30/2018 | A | PASS |
Tony Young
|
|
|
Tom Phone #: ###-####
|
DOC - Permit Finaled | 4/30/2018 | 4/30/2018 | 4/30/2018 | P | PASS |
Tony Young
|
|
|
all made ok,, c of c/o issued
|
BLD-Conference | 4/25/2018 | 4/26/2018 | 4/26/2018 | A | PART |
Tony Young
|
|
|
Tom Phone #: ###-####,, walk through for final,, needs fire caulking,, guard /hand rail
|
BLD-Energy code compliance | 1/2/2018 | 1/3/2018 | 1/3/2018 | P | PASS |
Tony Young
|
|
|
Ted Phone #: ###-####,, all ok now
|
BLD-Energy code compliance | 12/27/2017 | 12/28/2017 | 12/28/2017 | A | NR |
Tony Young
|
|
|
Tedd Phone #: ###-####
|
BLD-Energy code compliance | 12/26/2017 | 12/27/2017 | 12/27/2017 | P | PEND |
Jim Sly
|
|
|
Please call ahead for access - Ted Phone #: ###-#### Will re-schedule for tomorrow.
|
BLD-Framing/Rough-in | 12/20/2017 | 12/21/2017 | 12/21/2017 | A | PART |
Tony Young
|
|
|
Please call ahead for access - Ted Phone #: ###-####,, ok to insulate,, need a letter of ok from the structural for all components including exterior shear/bracing
|
BLD-Conference | 11/28/2017 | 11/29/2017 | 11/29/2017 | A | PART |
Tony Young
|
|
|
Ted-please call 1 hour prior to meet Phone #: ###-####,, met to look at job,, ok to move forward,, need engineer to verify exterior components
|
BLD-Other | 5/9/2017 | 5/9/2017 | 5/9/2017 | P | PEND |
Tony Young
|
|
|
Check status of project. verify project is secure against entry if abandoned,, home is being maintained on exterior grounds,, home owner lives accross the street,, he (Tom) said that he has funds going into place to finish the project,, talked about permit application process...
|
DOC - Permit Expired | 9/16/2010 | 9/17/2010 | 9/22/2010 | P | PASS |
Tony Young
|
|
|
|
BLD-Aging Inspection | 9/15/2010 | 9/15/2010 | 9/16/2010 | | FAIL |
Tony Young
|
|
|
|
BLD-Aging Inspection | 7/14/2010 | 7/14/2010 | 7/14/2010 | | PEND |
Tony Young
|
|
|
|
BLD-Aging Inspection | 5/10/2010 | 5/10/2010 | 5/10/2010 | | PEND |
Tony Young
|
|
|
|
BLD-Aging Inspection | 3/8/2010 | 3/8/2010 | 3/12/2010 | | PEND |
Tony Young
|
|
|
|
BLD-Conference | 1/4/2010 | 1/4/2010 | 1/5/2010 | P | PART |
Tony Young
|
|
|
check status of job still ok to keep active,, house has house wrap,, snow has been plowed
|
BLD-Aging Inspection | 12/29/2009 | 12/29/2009 | 1/4/2010 | | PEND |
Tony Young
|
|
|
|
BLD-Conference | 1/29/2008 | 1/30/2008 | 1/30/2008 | P | PASS |
Tony Young
|
|
|
Conference to sort out framing inspection questions Call Tom @ ###-#### half hour prior to inspection...or call to set a time? general ?s,, no engineering needed,, nail exterior plywood a little better then ok to cover
|
BLD-Framing/Rough-in | 1/22/2008 | 1/23/2008 | 1/23/2008 | A | NR |
Mike Jordan
|
|
|
tom - please call 1/2 hr prior to inspection Phone #: ###-####. No info on approved plans for exterior shear nailing requirements. Homeowner to contact framer and his architect to see if their was an engineering packet or missing S sheets from plans.
|
BLD-Concrete | 12/27/2007 | 12/28/2007 | 12/28/2007 | P | PART |
Tony Young
|
|
|
carl Phone #: ###-#### fireplace lift, wip
|
BLD-Foundation | 12/26/2007 | 12/27/2007 | 12/27/2007 | A | PART |
Tony Young
|
|
|
carl Phone #: ###-#### 1st 4' ok on re designed fire place
|
BLD-Other | 12/18/2007 | 12/19/2007 | 12/19/2007 | A | PART |
Tony Young
|
|
|
Carl, fireplace; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt looked at removal of portion of f/p
|
BLD-Conference | 12/3/2007 | 12/5/2007 | 12/5/2007 | A | PART |
Tony Young
|
|
|
tom Note: early as possible Phone #: ###-#### wanted to re do masonary wood burn f/place, ok as descibed w/ me need to show plan review for further approval
|
BLD-Foundation | 9/20/2007 | 9/20/2007 | 9/20/2007 | P | PASS |
Mike Jordan
|
|
|
pete Phone #: ###-####
|
BLD-Footing | 9/18/2007 | 9/18/2007 | 9/18/2007 | P | PART |
Jim Sly
|
|
|
pete Phone #: ###-#### Not all rebar in place......Talked to Concrete Contr. about rebar .....
|