BLD-Final | 9/28/2007 | 10/1/2007 | 10/1/2007 | A | PASS |
Mike Jordan
|
|
|
cameron Phone #: ###-####. ok for perm occ.
|
BLD-Final | 9/26/2007 | 9/27/2007 | 9/27/2007 | A | NR |
Mike Jordan
|
|
|
cameron - please call 1/2 hr prior to inspection Phone #: ###-####. Everything ok on ti portion, needs to get shell and core finaled.
|
FIRE-Final Inspection | 9/25/2007 | 9/25/2007 | 9/25/2007 | P | PASS |
Troy Cobbley
|
|
|
cameron Note:please contact for access Phone #: ###-####
|
BLD-Framing/Rough-in | 8/16/2007 | 8/16/2007 | 8/16/2007 | P | PART |
Mike Jordan
|
|
|
ceiling fire wall; Jeff; Phone #: ###-#### Internet Inspection Request from: Hattie James. interior soffitt. Framed with steel studs and fireblocked at 10ft. horizontally. Noted that conduits were not firecaulked, no tech data has been supplied. CXontractor to fircalk from attic side if applicable.
|
BLD-Wall cover | 8/15/2007 | 8/15/2007 | 8/15/2007 | P | PART |
Mike Jordan
|
|
|
Bill; Phone #: ###-#### Internet Inspection Request from: Hattie James. Screw pattern for rated ceiling and wall assemblies. Still need to verify firecaulking on elec. conduit penetrations.
|
BLD-Other | 8/10/2007 | 8/10/2007 | 8/10/2007 | P | PART |
Mike Jordan
|
|
|
JEFF nOTE: SHEET ROCK Phone #: ###-####. Base layer for 1hr ceiling assembly.
|
BLD-Energy code compliance | 8/8/2007 | 8/8/2007 | 8/8/2007 | P | PASS |
Mike Jordan
|
|
|
jeff Phone #: ###-####
|
BLD-Framing/Rough-in | 8/7/2007 | 8/7/2007 | 8/7/2007 | P | PASS |
Mike Jordan
|
|
|
jeff Phone #: ###-####
|
BLD-Conference | 7/23/2007 | 7/23/2007 | 7/23/2007 | P | DONE |
Mike Jordan
|
|
|
mark; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang
|