BLD-Final | 8/14/2007 | 8/15/2007 | 8/15/2007 | A | PASS |
Mike Jordan
|
|
|
Ben; call for access; Phone #: ###-#### Internet Inspection Request from: Hattie James
|
DOC - Permit Finaled | 8/15/2007 | 8/15/2007 | 8/15/2007 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Energy code compliance | 7/2/2007 | 7/3/2007 | 7/3/2007 | P | PASS |
Mike Jordan
|
|
|
paul; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang. All issues resolved. ok to cover.
|
BLD-Framing/Rough-in | 7/3/2007 | 7/3/2007 | 7/3/2007 | P | CANC |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 7/3/2007 at 7:21:48 AM. Contact: ###-####.
|
BLD-Conference | 7/3/2007 | 7/3/2007 | 7/3/2007 | A | FAIL |
Mike Jordan
|
|
|
ENERGY CODE INSP. Needs to provide R38 batts in attic upstairs. c/n posted. not ok to cover framing.
|
BLD-Framing/Rough-in | 7/2/2007 | 7/3/2007 | 7/3/2007 | A | PASS |
Mike Jordan
|
|
|
paul; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang. All framing issues have been resolved.
|
BLD-Framing/Rough-in | 6/28/2007 | 6/29/2007 | 6/29/2007 | P | FAIL |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 6/28/2007 at 7:45:31 AM. Contact: ###-####. Finish nailing off simpson hangars upstairs. Provide approved repair for floor joist were cut at end. Provide mech. connection on 2 ply at garage. c/n posted. ok to insul.
|
BLD-Foundation | 5/31/2007 | 5/31/2007 | 5/31/2007 | P | PASS |
Mike Jordan
|
|
|
matt; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Column pad footings added.
|
BLD-Footing | 5/30/2007 | 5/30/2007 | 5/30/2007 | P | PART |
Mike Jordan
|
|
|
matt; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Needs to add column pad footings at garage for piont loads as red lined on approved drawings. Will confirm on wall placement.
|
BLD-Footing | 5/29/2007 | 5/30/2007 | 5/30/2007 | A | NR |
Mike Jordan
|
|
|
matt; Phone #: ###-#### Internet Inspection Request from: Victoria Beall. hole is being dug.
|