BLD-Final | 1/26/2008 | 1/28/2008 | 1/28/2008 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 1/26/2008 at 3:25:11 PM. Contact: ###-####. temp occ ok pending bond and trades sign off
|
FIRE-Final Inspection | 1/28/2008 | 1/28/2008 | 1/28/2008 | P | PASS |
Forrest France
|
|
|
Fire life safety is satisfactory, posted max. occupant load is not correct- see plan annotations and fire code review notes for the correct number (80) to be posted- verified at structural final, remaining life safety is acceptable.
|
Code Occupancy Approval Temp | 1/25/2008 | 1/25/2008 | 1/25/2008 | P | DONE |
Michael Garner
|
|
|
Initial site inpsection complete - I noted that so far all the work appears to be completed according to approved plans and permits - however, inclimate weather has stalled landscaping and parking lot striping, neither one of which can be started/completed until the snow is gone and the temperature rises quite a bit - Kyle, the contractor on site with whom i've spoken on the telehone is proceeding with a temporary; and, will be getting a bond for unfinished work - I will schedule a research follow up for next week to make sure the bonding is good - TEMPORARY ONLY PASS
|
BLD-Framing/Rough-in | 1/22/2008 | 1/23/2008 | 1/23/2008 | A | PASS |
Mike Jordan
|
|
|
Kyle; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt. ceiling grid ok to cover.
|
BLD-Framing/Rough-in | 1/22/2008 | 1/22/2008 | 1/22/2008 | P | PART |
Mike Jordan
|
|
|
###-#### - kyle. Ok to place perimeter tile in ceiling grid. Needs to wire hvac diffusers and speakers.
|
BLD-Energy code compliance | 12/17/2007 | 12/17/2007 | 12/17/2007 | P | PASS |
Mike Jordan
|
|
|
kyle Phone #: ###-####
|
BLD-Framing/Rough-in | 12/13/2007 | 12/13/2007 | 12/14/2007 | P | PASS |
Dave Hannah
|
|
|
kyle Note: interior framing Phone #: ###-#### ok to insulate
|
BLD-Framing/Rough-in | 12/3/2007 | 12/4/2007 | 12/4/2007 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 12/3/2007 at 8:52:42 AM. Contact: ###-####. exterior ok to cover
|
BLD-Concrete | 11/8/2007 | 11/9/2007 | 11/9/2007 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 11/8/2007 at 3:53:29 PM. Contact: ###-####. hairpins in slab ok,, ftg/fnd mono ok for trash enclosure
|
BLD-Footing | 10/9/2007 | 10/10/2007 | 10/10/2007 | A | PASS |
Jim Sly
|
|
|
kyle Note: stem wall Phone #: ###-####
|
BLD-Footing | 10/4/2007 | 10/4/2007 | 10/4/2007 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 10/4/2007 at 11:12:15 AM. Contact: ###-####.
|