BLD-Final | 12/11/2007 | 12/12/2007 | 12/12/2007 | A | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 12/11/2007 at 3:55:34 PM. Contact: ###-####. Elec. final shows pass in history, but permit was not dock finaled.
|
DOC - Permit Finaled | 12/12/2007 | 12/12/2007 | 12/12/2007 | P | PASS |
Mike Jordan
|
|
|
All issues resolved. Letter of compliance issued for shell and core.
|
BLD-Final | 12/4/2007 | 12/4/2007 | 12/4/2007 | P | NR |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 12/4/2007 at 10:55:55 AM. Contact: ###-####. Needs to have failing density issue resolved with engineer prior to final.
|
Code Occupancy Approval | 12/4/2007 | 12/4/2007 | 12/4/2007 | P | PASS |
Scott M.Brown
|
|
|
OK FOR FINAL
|
FIRE-Final Inspection | 11/26/2007 | 11/27/2007 | 11/27/2007 | A | PASS |
Troy Cobbley
|
|
|
life safety passed.
|
BLD-Final | 11/15/2007 | 11/16/2007 | 11/16/2007 | P | NR |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 11/15/2007 at 3:56:45 PM. Contact: ###-####.
|
FIRE-Final Inspection | 11/15/2007 | 11/16/2007 | 11/16/2007 | A | FAIL |
Troy Cobbley
|
|
|
Items such as the duct smoke detectors were not ready to test. No inspection was performed.
|
FIRE-Final Inspection | 11/7/2007 | 11/8/2007 | 11/8/2007 | A | FAIL |
Troy Cobbley
|
|
|
Provide address on building where is can be viewable as discussed, provide power so the exit sign and emergency lighting can be tested, provide remote annunciators and manometer tests for the duct smoke detectors and repair the curb painting as discussed.
|
BLD-Other | 9/6/2007 | 9/7/2007 | 9/7/2007 | P | CANC |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 9/6/2007 at 4:28:07 PM. Contact: ###-####. Wrong insp. called in.
|
BLD-Framing/Rough-in | 8/10/2007 | 8/13/2007 | 8/13/2007 | A | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 8/10/2007 at 3:26:58 PM. Contact: ###-####. All required fireblocking completed.
|
FIRE-Conference | 8/9/2007 | 8/9/2007 | 8/9/2007 | P | DONE |
Forrest France
|
|
|
Discussion with contractor and structural inspector regarding concealed spaces at the exterior of the building.
|
BLD-Framing/Rough-in | 8/8/2007 | 8/9/2007 | 8/9/2007 | A | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 8/8/2007 at 2:04:36 PM. Contact: ###-####. Exterior shear nailing and roof diaphragm. Also inspected framing. Needs to complete fireblocking. ok to insul.
|
BLD-Foundation | 6/29/2007 | 7/2/2007 | 7/2/2007 | A | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 6/29/2007 at 4:20:53 PM. Contact: ###-####.
|
BLD-Footing | 6/26/2007 | 6/27/2007 | 6/27/2007 | P | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 6/26/2007 at 4:18:15 PM. Contact: ###-####.
|