BLD-Final | 10/12/2007 | 10/15/2007 | 10/15/2007 | A | PASS |
Mike Jordan
|
|
|
lee - please call for access Phone #: ###-####
|
DOC - Permit Finaled | 10/15/2007 | 10/15/2007 | 10/15/2007 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Energy code compliance | 8/8/2007 | 8/9/2007 | 8/9/2007 | P | PASS |
Mike Jordan
|
|
|
lee Phone #: ###-####
|
BLD-Framing/Rough-in | 8/6/2007 | 8/7/2007 | 8/7/2007 | P | PASS |
Mike Jordan
|
|
|
lee Phone #: ###-####. ok to insul.
|
BLD-Framing/Rough-in | 8/2/2007 | 8/3/2007 | 8/3/2007 | A | FAIL |
Mike Jordan
|
|
|
lee Phone #: ###-####. Needs to provide a complete set of truss engineering, and complete air seal package prior to framing insp. c/n posted.
|
BLD-Footing | 6/5/2007 | 6/6/2007 | 6/6/2007 | P | PART |
Mike Jordan
|
|
|
Chris; Phone #: ###-#### Internet Inspection Request from: Barbara Stitt. Property lines were not marked on existing lot. Contractor refused to have lot surveyed. Set backs APPEAR to be ok. Noted to contractor that he is accepting full liability if setbacks are incorrect and will have to be repaired.
|