Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD07-01692
StatusFinaled
Name ST LUKES REG MED CNTR
Site Address 190 E BANNOCK ST
Project NameST LUKES-S EAST + E ANNEX
Customer Number 
ePlanReviewNo
Description
(ST LUKES - SOUTH - EAST + EAST ANNEX - PHASE V REMODEL - PACU, ANESTHESIA WORK ROOM, SAT. PHARMACY) This building is fully sprinklered based on occupancy use group. To remodel approximately 12,750 sq. ft. of existing hospital area to update and improve patient care services & for operating room prep and recovery and support services. Work includes select interior demolition; construction of non-combustible, non-rated & fire-rated, fire-resistive walls; upgrade of electrical, mechanical, plumbing, med gas, sprinkler and alarm systems; suspended ceiling grid, interior finishes and millwork, all per reviewed plans. drs
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/25/20096/25/20096/25/2009APASS
DetailsDave Hannah
Phone #: ###-#### Internet Inspection Request from: Phil Doble ok for perm occ
BLD-Final6/22/20096/22/20096/22/2009AFAIL
DetailsDave Hannah
Phone #: ###-#### Internet Inspection Request from: Phil Doble needs 45 min door on bed storage room
FIRE-Final Inspection6/11/20096/11/20096/11/2009APASS
DetailsForrest France
Fire life safety approved for final.
FIRE-Conference6/10/20096/10/20096/10/2009ADONE
DetailsForrest France
FIR07-00827 Phone #: ###-#### Internet Inspection Request from: Phil Doble NOTE: permit # FIR08-00776 still in the "issued status" as project attatched.
BLD-Final5/14/20095/15/20095/15/2009ANR
DetailsDave Hannah
Phone #: ###-#### Internet Inspection Request from: Phil Doble
BLD-Framing/Rough-in5/12/20095/12/20095/12/2009APART
DetailsDave Hannah
Phone #: ###-#### Internet Inspection Request from: Phil Doble ok to cover ceiling in isolation rooms
BLD-Conference5/8/20095/8/20095/8/2009APASS
DetailsDave Hannah
Phone #: ###-#### Internet Inspection Request from: Phil Doble
BLD-Wall cover4/23/20094/23/20094/24/2009APART
DetailsDave Hannah
Phone #: ###-#### Internet Inspection Request from: Phil Doble ok to cover shaft
BLD-Wall cover2/27/20092/27/20092/27/2009APART
DetailsDave Hannah
Phone #: ###-#### Internet Inspection Request from: Phil Dobleok to cover ceiling
BLD-Wall cover2/11/20092/11/20092/12/2009APART
DetailsDave Hannah
Phone #: ###-#### Internet Inspection Request from: Phil Doble shaft wall ok to cover
BLD-Wall cover1/5/20091/5/20091/5/2009APART
DetailsDave Hannah
Phone #: ###-#### Internet Inspection Request from: Phil Doble ok to cover ceilings in this phase
BLD-Final10/24/200810/24/200810/24/2008APART
DetailsDave Hannah
Phone #: ###-#### Internet Inspection Request from: Phil Doble area a ph 5 ok to move into
BLD-Framing/Rough-in9/19/20089/19/20089/19/2008APART
DetailsDave Hannah
or ###-#### Phone #: ###-#### Internet Inspection Request from: Phil Doble ok to cover ceiling in area A ph5
BLD-Wall cover8/11/20088/11/20088/11/2008APART
DetailsDave Hannah
Phone #: ###-#### Internet Inspection Request from: Phil Doble ok to cover awalls need new fire life safty plan
FIRE-Final Inspection5/1/20085/2/20085/2/2008APART
DetailsForrest France
Fire life safety is satisfactory for the areas inspected today including the sat. pharmacy, work room and anesthesia soils room, door seals installed while on site, one noted fire sprinkler head at the pharmacy has been added, adjacent fire doors at the corridor to be adjusted as discussed with contractor.
BLD-Wall cover4/3/20084/3/20084/3/2008APART
DetailsDave Hannah
Phone #: ###-#### Internet Inspection Request from: Phil Doble ceiling grid ok to cover
BLD-Wall cover2/21/20082/21/20082/21/2008APART
DetailsDave Hannah
Phone #: ###-#### Internet Inspection Request from: Phil Doble phase5b section d ok to cover walls
BLD-Wall cover2/5/20082/5/20082/5/2008APART
DetailsDave Hannah
Phone #: ###-#### Internet Inspection Request from: Phil Doble shaft needs to frame around fire dampers and center damper in wall also fire caulk fire wall
BLD-Final1/8/20081/8/20081/8/2008APART
DetailsDave Hannah
Phone #: ###-#### Internet Inspection Request from: Phil Doble ok to move into ant rooms after other trades ok
BLD-Conference11/14/200711/14/200711/14/2007ADONE
DetailsDave Hannah
Phone #: ###-#### Internet Inspection Request from: Phil Doble
BLD-Wall cover10/12/200710/12/200710/12/2007APART
DetailsDave Hannah
Phone #: ###-#### Internet Inspection Request from: Phil Doble ok to cover shafts
BLD-Framing/Rough-in10/5/200710/5/200710/5/2007PPART
DetailsDave Hannah
Phone #: ###-#### Internet Inspection Request from: Phil Doble int walls ok need to finish shaftes and corr wall
BLD-Framing/Rough-in10/5/200710/5/200710/5/2007ACANC
DetailsDave Hannah
Phone #: ###-#### Internet Inspection Request from: Phil Doble