BLD-Final | 4/10/2008 | 4/11/2008 | 4/11/2008 | P | PASS |
Jim Storey
|
|
|
Please call at least 57.5 minutes before inspection. Phone #: ###-#### Internet Inspection Request from: Steve Meyer
|
BLD-Conference | 4/9/2008 | 4/9/2008 | 4/9/2008 | P | PART |
Jim Storey
|
|
|
Steve, please call 30 minutes prior; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt smoke seal/ 34 counter height mens rm/ theshold trans at storage area/ occ load sign.
|
Code Occupancy Approval | 4/8/2008 | 4/8/2008 | 4/8/2008 | P | PASS |
Dena Gambrel
|
|
|
4-8-08 1150 Passed Final Occupancy.
|
FIRE-Final Inspection | 4/3/2008 | 4/4/2008 | 4/4/2008 | A | PASS |
Forrest France
|
|
|
Life safety inspection complete.KR
|
FIRE-Final Inspection | 4/2/2008 | 4/3/2008 | 4/3/2008 | A | FAIL |
Forrest France
|
|
|
Could not complete inspection due to emergency lighting not workig and fire alarm not finaled.KR
|
BLD-Conference | 3/18/2008 | 3/19/2008 | 3/19/2008 | A | PASS |
Jim Storey
|
|
|
Ceiling grid-OK to drop ceiling tile Phone #: ###-#### Internet Inspection Request from: Steve Meyer ok pending mech insp.
|
BLD-Wall cover | 2/26/2008 | 2/27/2008 | 2/27/2008 | A | PART |
Jim Storey
|
|
|
2 hr walls. Fire sealant inspection Phone #: ###-#### Internet Inspection Request from: Steve Meyer ok for all wyanes coat aplacations.
|
BLD-Wall cover | 2/24/2008 | 2/25/2008 | 2/25/2008 | A | PASS |
Jim Storey
|
|
|
partial framing, drywall screw on non rated walls, 1st layer on 2 hr walls. Phone #: ###-#### Internet Inspection Request from: Steve Meyer
|
BLD-Wall cover | 2/23/2008 | 2/25/2008 | 2/24/2008 | A | CANC |
Jim Storey
|
|
|
Drywall screw & 1st layer on 2 hour walls. Phone #: ###-#### Internet Inspection Request from: Steve Meyer Inspection cancelled from web by: Steve Meyer
|
BLD-Framing/Rough-in | 2/22/2008 | 2/22/2008 | 2/22/2008 | P | PART |
Jim Sly
|
|
|
kitchen rear area wall cover-see Steve for clairification Phone #: ###-#### Internet Inspection Request from: Steve Meyer Putty pads for (electr) thru penitrations at 2hr walls installed. OK to cover select walls as follows......Between office and Mech rm, storage and prep rm, Non combustible (hood) wall, 2hr wall between Kitch and restroom, Kitchen header wall, All exterior walls in main dining area up to 9' level. Advised Steve to call for inspections of 1st layer of all 2hr walls. OK to cover restroom ceilings.....inspected everything above, and complys with 2hr rating. Advised Steve to provide info for exposed icynene insulation located at exterior walls above 9' level.
|
BLD-Framing/Rough-in | 2/14/2008 | 2/15/2008 | 2/15/2008 | P | PART |
Jim Storey
|
|
|
chewie Phone #: ###-#### ok to start 2 hr wall cover.
|
BLD-Foundation | 12/7/2007 | 12/7/2007 | 12/7/2007 | P | PART |
Jim Storey
|
|
|
john - early afternoon please Phone #: ###-#### placed with si
|
BLD-Footing | 12/7/2007 | 12/7/2007 | 12/7/2007 | A | PART |
Jim Storey
|
|
|
si to insp. need to maintane 3 in doby to bottom of rebar cages.
|