BLD-Final | 10/30/2007 | 10/30/2007 | 10/30/2007 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 10/30/2007 at 6:27:49 AM. Contact: ###-####.ok for perm occ
|
BLD-Final | 10/5/2007 | 10/5/2007 | 10/6/2007 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 10/4/2007 at 7:07:26 AM. Contact: ###-####. ok for temp occ ok for perm occ after plumbing oks for perm
|
BLD-Final | 10/4/2007 | 10/5/2007 | 10/6/2007 | A | CANC |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 10/4/2007 at 7:07:26 AM. Contact: ###-####.
|
BLD-Final | 10/4/2007 | 10/4/2007 | 10/4/2007 | A | NR |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 10/4/2007 at 7:07:26 AM. Contact: ###-####. needs other trades to final
|
FIRE-Final Inspection | 10/3/2007 | 10/4/2007 | 10/4/2007 | A | PASS |
Forrest France
|
|
|
Fire life safety passed.
|
BLD-Framing/Rough-in | 9/24/2007 | 9/24/2007 | 9/25/2007 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 9/24/2007 at 7:39:45 AM. Contact: ###-####.ceiling grid ok to cover
|
BLD-Framing/Rough-in | 9/10/2007 | 9/10/2007 | 9/11/2007 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 9/10/2007 at 9:38:19 AM. Contact: ###-####.ok to cover walls
|
BLD-Framing/Rough-in | 9/6/2007 | 9/6/2007 | 9/6/2007 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 9/6/2007 at 8:13:25 AM. Contact: ###-####. ok to cover all but plumbing walls
|