Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD07-01869
StatusFinaled
Name NEESER PATRICK J AND JOYCE TURNBOOM
Site Address 3213 N TAMARACK DR
Project Name 
Customer Number 
ePlanReviewNo
Description
"THIS PROJECT MODIFIED TO REFLECT THE ADDITION OF A NEW 3/4/ BATHROOM AREA ON THE 2ND FLOOR OFF OF ONE OF THE OFFICES. 10-10-2008 PEP " "8-11-2008 THIS PROJECT IS MODIFIED TO REFLECT THE EXTENSION OF THE TRUSSED AREA OVER THE MASTER BATH AND CLOSET CREATING A NEW 144 + - COVERED PATIO AREA. 144 S.F. @ $15.00 PER = $ 2160 FOR ADDED VALUE. 8-11-2008" This addition project is to add 1700s.f. to an existing 2000s.f. 1-story single family dwelling. the project will used foam form panels for the basement and main level and will be ok for the upper level walls if supporting engineering is supplied to the structural inspector prior to concrete placement. As the concrete walls are designed using the IBC special inspection is required per the ESR-1421 (attached). Separate electrical, plumbing, mechanical and ESC permits are required. R-1AS ok per David Moser. All per the approved plans as marked REScheck, engineering and Engineer's calculations along with the plan review notes. pep
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/2/20097/7/20097/7/2009PPASS
DetailsTony Young
patrick Phone #: ###-#### or ###-####
DOC - Permit Finaled7/7/20097/7/20097/7/2009PPASS
DetailsTony Young
c of c issued
BLD-Conference4/27/20094/27/20094/27/2009APART
DetailsTony Young
Patrick Phone #: ###-####
?s on final,,
BLD-Conference4/24/20094/24/20094/27/2009PPART
DetailsTony Young
Patrick Phone #: ###-####
new beam ok in basement ceiling,, added to help support floor trusses,, per engineering
BLD-Conference4/23/20094/24/20094/24/2009ACANC
DetailsTony Young
Patrick Phone #: ###-####
BLD-Conference3/25/20093/25/20093/26/2009PPART
DetailsTony Young
joyce Phone #: ###-####
conf on stairs,,
BLD-Conference2/3/20092/4/20092/5/2009PPART
DetailsTony Young
patrick Phone #: ###-####
conf on final requirements
BLD-Energy code compliance1/2/20091/5/20091/5/2009APASS
DetailsTony Young
joyce Phone #: ###-####
BLD-Framing/Rough-in12/11/200812/11/200812/11/2008PPASS
DetailsTony Young
joyce Phone #: ###-####
BLD-Framing/Rough-in12/3/200812/3/200812/3/2008PPART
DetailsTony Young
phil Note: early as possible please Phone #: ###-####
still need trades,, conf
BLD-Framing/Rough-in12/2/200812/2/200812/2/2008PNR
DetailsTony Young
joyce Note: please call 1/2 hr prior to inspection Phone #: ###-####
extensive conf only,, need trades
BLD-Framing/Rough-in9/3/20089/3/20089/3/2008PNR
DetailsTony Young
phil Phone #: ###-####
extensive frame conf only
BLD-Footing8/11/20088/12/20088/12/2008APASS
DetailsTony Young
Phil Phone #: ###-####
post on north side of house ok
BLD - Request for Extension6/30/20087/1/20087/1/2008 PASS
DetailsTony Young
Mid construction stop - so they had to aquired another loan so they would like to extend this permit another 6 mnths - Joyce Turnboom - ###-#### please let her know so she can get the loan asap!!!
BLD-Foundation10/31/200711/1/200711/1/2007APART
DetailsTony Young
larry Phone #: ###-####
walls for basement,, wip,, pending special inspection report
BLD-Foundation10/25/200710/26/200710/29/2007PPART
DetailsTony Young
larry Phone #: ###-####
wip,, ok pending special inspection report, foam wall forms, also conf on egress window sizes
BLD-Footing10/19/200710/22/200710/22/2007APART
DetailsTony Young
Joyce or 1-###-#### larry-for concrete info Phone #: ###-####
wip on basement ftgs