BLD-Aging Inspection | 10/20/2010 | 10/20/2010 | 10/20/2010 | | DONE |
Jim Sly
|
|
|
Previously finaled by 301
|
DOC - Permit Finaled | 10/20/2010 | 10/20/2010 | 10/20/2010 | P | PASS |
Jim Sly
|
|
|
|
BLD-Final | 7/29/2009 | 7/29/2009 | 7/29/2009 | P | PASS |
Jim Storey
|
|
|
isued l/c
|
BLD-Final | 7/1/2009 | 7/1/2009 | 7/2/2009 | P | NR |
Jim Sly
|
|
|
tom Phone #: ###-#### - please call prior Need Zoning final.
|
BLD-Final | 6/29/2009 | 6/29/2009 | 6/29/2009 | P | NR |
Jim Sly
|
|
|
Tom Phone #: ###-####
|
BLD-Final | 4/14/2009 | 4/14/2009 | 4/15/2009 | P | NR |
Jim Sly
|
|
|
Per your request- I have also sent ele, mec &plm out for this Need all trades, and zoning finals.
|
BLD-Final | 4/6/2009 | 4/7/2009 | 4/8/2009 | A | NR |
Jim Sly
|
|
|
Called Jonathan Randall.......Left VM. Told him that he needed to have his subs call in final inspections.........and he needed to get finals on Zoning, ESC and building.
|
BLD-Conference | 4/6/2009 | 4/6/2009 | 4/6/2009 | P | CANC |
Jim Sly
|
|
|
Barb at the permits desk--status of overall project Phone #: ###-#### Re-sched........
|
BLD-Footing | 6/18/2008 | 6/18/2008 | 6/18/2008 | P | PART |
Jim Sly
|
|
|
pete - block inspection - early as possible please Phone #: ###-#### CMU Block up to height of slab ....OK
|
BLD-Foundation | 6/3/2008 | 6/4/2008 | 6/4/2008 | P | PASS |
Jim Sly
|
|
|
john Note: rebar Phone #: ###-####
|
BLD-Final | 4/11/2008 | 4/11/2008 | 4/11/2008 | P | NR |
Jim Sly
|
|
|
WIP
|
BLD-Aging Inspection | 4/11/2008 | 4/11/2008 | 4/11/2008 | | CANC |
Jim Sly
|
|
|
Re-scheduled
|