BLD-Final | 3/23/2008 | 3/24/2008 | 3/24/2008 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 3/23/2008 at 9:50:51 PM. Contact: ###-####. C/C issued
|
DOC - Permit Finaled | 3/24/2008 | 3/24/2008 | 3/24/2008 | P | PASS |
Jim Sly
|
|
|
|
BLD-Final | 3/16/2008 | 3/17/2008 | 3/17/2008 | P | FAIL |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 3/16/2008 at 8:18:52 PM. Contact: ###-####. need 1.5 inches at colum to handrail clearance.
|
BLD-Final | 2/17/2008 | 2/19/2008 | 2/19/2008 | A | FAIL |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 2/17/2008 at 8:43:10 AM. Contact: ###-####. 311.5.6.2 Continuity. Handrails for stairways shall be continuous for the full length of the flight, from a point directly above the top riser of the flight to a point directly above lowest riser of the flight. Handrail ends shall be returned or shall terminate in newel posts or safety terminals. Handrails adjacent to a wall shall have a space of not less than 1 1/2 inch (38 mm) between the wall and the handrails. Exceptions: 1. Handrails shall be permitted to be interrupted by a newel post at the turn. 2. The use of a volute, turnout, starting easing or starting newel shall be allowed over the lowest tread.
|
BLD-Framing/Rough-in | 9/26/2007 | 9/27/2007 | 9/27/2007 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 9/26/2007 at 1:44:42 PM. Contact: ###-####.
|
BLD-Footing | 9/17/2007 | 9/17/2007 | 9/17/2007 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 9/17/2007 at 9:56:53 AM. Contact: ###-####.
|