Permit Information
Permit NumberBLD07-02085
StatusFinaled
Name COLSON & COLSON GENERAL CONTRACTOR
Site Address 4906 N CLOVERDALE RD
Project NameBoise Retirement Residence
Customer Number 
ePlanReviewNo
Description
(BOISE RETIREMENT RESIDENCE - BLDG B - EAST SECTION) To construct a new 60 unit 44,546 square foot, three story, I-1, non state licensed, residential care assisted, living facility, where all residence will be capable of responding to an emergency situation without physical assistance. This building to be fully fire sprinklered with an NFPA 13 system for area increase. This area is separated from the center building (Section A) by a 2-hr. fire wall. Note: This project was reviewed by ICC for energy, structural, nonstructural and accessibility requirements for code compliance. (52 units less than 800 sq.ft. and 8 units more than 800 sq.ft.)
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/20/200910/21/200910/20/2009APASS
DetailsJim Sly
bryan Phone #: ###-####
OK for Perm Occ.
FIRE-Final Inspection10/20/200910/20/200910/20/2009PPASS
DetailsTroy Cobbley
Life safety passed.
BLD-Final10/19/200910/19/200910/19/2009PNR
DetailsJim Sly
Bryan phone ###-####
Need fire final.
FIRE-Final Inspection10/5/200910/6/200910/6/2009AFAIL
DetailsTroy Cobbley
The occupant load signs have been mounted and the exit signs, emergency lighting and exit discharge lighting have been verified for functionality. One emergency light and one exit sign need repaired as discussed. See the 10/5/2009 entry for other items needing addressed prior to a final sign off. The relocation of the generator is ok per scott and the fire alarm panel can provide supervision of the primary power at the horizontal sliding doors per Jason Blaise.
FIRE-Final Inspection10/1/200910/5/200910/5/2009PFAIL
DetailsTroy Cobbley
The project related fire sprinkler and fire alarm permits need to be finaled, both of the horizontal sliding doors need to be adjusted so that they easily open manually, the atrium smoke evacuation system needs to be addressed, the exit discharge lighting needs to be removed from control by the photocells and electrical super vision of the horizontal sliding doors needs to be addressed. All of the exit signs, emergency lights and exit discharge lights need to be inspected for placement and tested for functionality after the generator switch over has been repaired. Also need to verify that the relocation of the emergency generator is ok with plan review.
BLD-Final9/15/20099/16/20099/16/2009APEND
DetailsJim Sly
Phone #: ###-#### Internet Inspection Request from: Bryan Herb
Walk-thru all sleeping units.........OK. Need all Req. signatures for final.
BLD-Other9/10/20099/14/20099/14/2009PPASS
DetailsJim Storey
Drop ceiling grid inspection Phone #: ###-#### Internet Inspection Request from: Bryan Herb
BLD-Other8/24/20098/25/20098/25/2009ANR
DetailsJim Sly
suspended ceiling Phone #: ###-#### Internet Inspection Request from: Bryan Herb
BLD-Wall cover5/7/20095/8/20095/10/2009PPASS
DetailsJim Sly
1st floor sheetrock nailing Phone #: ###-#### Internet Inspection Request from: Bryan Herb
BLD-Energy code compliance4/23/20094/24/20094/24/2009APASS
DetailsJim Sly
1st floor insulation Phone #: ###-#### Internet Inspection Request from: Bryan Herb
BLD-Wall cover4/21/20094/22/20094/22/2009PPASS
DetailsJim Sly
2nd floor sheetrock nailing Phone #: ###-#### Internet Inspection Request from: Bryan Herb
BLD-Framing/Rough-in4/16/20094/16/20094/16/2009PPART
DetailsJim Sly
Brian Phone 2nd flr OK
BLD-Energy code compliance4/15/20094/16/20094/16/2009ACANC
DetailsJim Sly
2nd floor insulation Phone #: ###-#### Internet Inspection Request from: Bryan Herb
BLD-Wall cover4/14/20094/15/20094/15/2009APASS
DetailsJim Sly
sheetrock Phone #: ###-#### Internet Inspection Request from: Bryan Herb
3rd flr ok
BLD-Wall cover4/7/20094/7/20094/7/2009PPART
DetailsJim Sly
1st floor inspection to insulate Phone #: ###-#### Internet Inspection Request from: Bryan Herb......OK
BLD-Energy code compliance4/6/20094/7/20094/7/2009PPART
DetailsJim Sly
For 3pm if possible. Thanks Phone #: ###-#### Internet Inspection Request from: Bryan Herb
3rd Floor OK
BLD-Wall cover4/2/20094/3/20094/3/2009APASS
DetailsJim Sly
2nd floor Phone #: ###-#### Internet Inspection Request from: Bryan Herb
2nd floor OK to cover
BLD-Wall cover3/23/20093/25/20093/25/2009AFAIL
DetailsJim Sly
inspection to insulate all three floors of B wing. Phone #: ###-#### Internet Inspection Request from:
Complete firestopping.
BLD-Conference3/18/20093/19/20093/19/2009ACANC
DetailsJim Sly
BLD-Conference3/17/20093/19/20093/19/2009ADONE
DetailsJim Sly
Phone #: ###-#### Internet Inspection Request from: Bryan Herb
BLD-Wall cover3/17/20093/17/20093/17/2009PPART
DetailsJim Sly
Would like to sheet rock 3rd floor ceiling. Phone #: ###-#### Internet Inspection Request from: Bryan Herb
3rd Flr ceiling OK
FIRE-Sprinkler Rough-in3/17/20093/17/20093/17/2009PPASS
DetailsTroy Cobbley
A sprinkler inspection was performed on the attic dry system for Building B. The attic system in building B can be covered. See the city approved plans, FIR08-00831, for the specific area. The inspection report is being made under the building permit due to the sprinkler permit being in the review status for wet system changes requiring resubmittals.
FIRE-Sprinkler Rough-in3/17/20093/17/20093/17/2009APASS
DetailsTroy Cobbley
A sprinkler inspection was performed on the attic dry system for Building B. See the city approved sprinkler plans for locations where three sprinkler heads need to be added. The inspection report is being made under the building permit due to the sprinkler permit being in the review status for wet system changes requiring resubmittals.
BLD-Framing/Rough-in2/24/20092/25/20092/25/2009APART
DetailsJim Sly
hallway insulation inspection Phone #: ###-#### Internet Inspection Request from: Bryan Herb
OK to cover hallway ceilings 1st and 2nd flr.
BLD-Conference2/19/20092/20/20092/20/2009ADONE
DetailsJim Sly
Herb phone
BLD-Framing/Rough-in2/19/20092/19/20092/19/2009PPART
DetailsJim Sly
Herb phone
Epoxy hold down inspection.....OK pending MTI special insp, tests, and approvals.
BLD-Framing/Rough-in2/18/20092/19/20092/19/2009ANR
DetailsJim Sly
ATS holddown system. MTI is scheduled to begin their inspection about 10 if you want to be here. Phone #: ###-#### Internet Inspection Request from: Bryan Herb
BLD-Framing/Rough-in2/17/20092/17/20092/17/2009PFAIL
DetailsJim Sly
fire caulk reinspection for hallways Phone #: ###-#### Internet Inspection Request from: Bryan Herb
Minor Corrections 1st and 2nd floors
BLD-Framing/Rough-in2/12/20092/13/20092/13/2009AFAIL
DetailsJim Sly
fire caulk inspection prior to hallway insulation Phone #: ###-#### Internet Inspection Request from: Bryan Herb
Need UL listings For All Penitrating items.
BLD-Foundation2/9/20092/10/20092/10/2009APASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 2/9/2009 at 1:55:57 PM. Contact: ###-####.
Foundation for bus garages OK......Garages shown on plan, but not included in scope of work (verbage) on any of the (3) permits for this project. Brian said he would contact PDS and verify OK.
BLD-Conference2/5/20092/6/20092/6/2009ADONE
DetailsJim Sly
look at penetrations and discuss before we start fire caulking Phone #: ###-#### Internet Inspection Request from: Bryan Herb
BLD-Conference2/5/20092/6/20092/5/2009ACANC
DetailsJim Sly
discuss fire protection before we begin fire caulking. Phone #: ###-#### Internet Inspection Request from: Bryan Herb Inspection cancelled from web by: Bryan Herb
BLD-Framing/Rough-in1/22/20091/26/20091/26/2009PPART
DetailsJim Sly
interior sheer wall Phone #: ###-#### Internet Inspection Request from: Bryan Herb
Interior Shear wall nailing at "B" wing...3 floors OK.
BLD-Framing/Rough-in1/8/20091/12/20091/12/2009APART
DetailsJim Sly
shearwall and roof inspection Phone #: ###-#### Internet Inspection Request from: Bryan Herb
Exterior nailing at "B" wing (walls and Roof) OK
BLD-Framing/Rough-in12/31/20081/5/20091/5/2009ACANC
DetailsJim Sly
Exterior sheer nailing Phone #: ###-#### Internet Inspection Request from: Bryan Herb
Canc by Contr....
BLD-Conference12/4/200812/8/200812/8/2008ADONE
DetailsJim Sly
Phone #: ###-#### Internet Inspection Request from: Bryan Herb
Met with Bryan, Mike and Rich (the framer)....Mike Phone ###-####
BLD-Concrete10/31/200810/31/200810/31/2008PPART
DetailsJim Sly
interior footing rebar Phone #: ###-#### Internet Inspection Request from: Bryan Herb MTI on site
BLD-Concrete10/23/200810/24/200810/24/2008PPART
DetailsJim Sly
Flat work prep Phone #: ###-#### Internet Inspection Request from: Bryan Herb
MTI on site
BLD-Energy code compliance10/1/200810/3/200810/3/2008APART
DetailsJim Sly
If possible would like inspection around 10am for continued foundation insulation. Phone #: ###-#### Internet Inspection Request from: Bryan Herb
Foundation insulation West wall OK.
BLD-Energy code compliance9/29/200810/1/200810/1/2008APART
DetailsJim Sly
Foundation insulation inspection for backfill. Phone #: ###-#### Internet Inspection Request from: Bryan Herb
Appears OK.
BLD-Foundation9/25/20089/26/20089/26/2008PPART
DetailsJim Sly
Phone #: ###-#### Internet Inspection Request from: Bryan Herb
Wall OK Pend MTI insp and approvals
BLD-Footing9/23/20089/23/20089/23/2008PCANC
DetailsJim Sly
Brian Phone #: ###-####
BLD-Footing9/22/20089/23/20089/23/2008APART
DetailsJim Sly
bryan Phone #: ###-####
East 3rd of Bldg #3 footings OK 2500 psi design...... Special insp cylinders MTI MTI approval for Sub Grade.