BLD-Final | 9/16/2009 | 9/17/2009 | 9/17/2009 | P | PART |
Mike Jordan
|
|
|
ray Phone #: ###-####. ok for temp occ. Will be ok for perm occ once zoning signs off.
|
FIRE-Final Inspection | 9/16/2009 | 9/16/2009 | 9/17/2009 | P | PASS |
Forrest France
|
|
|
Fire life safety inspection completed acceptable.
|
BLD-Energy code compliance | 8/4/2009 | 8/5/2009 | 8/5/2009 | A | PASS |
Mike Jordan
|
|
|
ray - after 10 please Phone #: ###-####. ok for cover.
|
BLD-Other | 8/3/2009 | 8/4/2009 | 8/4/2009 | A | CANC |
Mike Jordan
|
|
|
cold seal and rock wool//Ray Phone #: ###-####
|
BLD-Framing/Rough-in | 8/4/2009 | 8/4/2009 | 8/4/2009 | A | PASS |
Mike Jordan
|
|
|
cold seal and rock wool//Ray Phone #: ###-####. All issues have been resolved. ok to insul.
|
BLD-Framing/Rough-in | 8/3/2009 | 8/3/2009 | 8/3/2009 | P | FAIL |
Mike Jordan
|
|
|
ray Phone #: ###-####. Needs to complete airseal and provide truss engineering. aalso needs to firecaulk all penetrations, provide fireblocking at all furouts and repair studs that have been cut.
|
Code Occupancy Approval Temp | 5/28/2008 | 5/28/2008 | 5/28/2008 | P | DONE |
Scott M.Brown
|
|
|
BOND POSTED FOR LANDSCAPE + $150,359. TEMP SIGNED.
|
BLD-Other | 4/2/2008 | 4/2/2008 | 4/2/2008 | P | PART |
Mike Jordan
|
|
|
ron - note: shear Phone #: ###-####. Exterior shear only.
|
BLD-Foundation | 2/27/2008 | 2/27/2008 | 2/27/2008 | P | PASS |
Mike Jordan
|
|
|
dane Phone #: ###-####
|
BLD-Footing | 2/26/2008 | 2/26/2008 | 2/26/2008 | P | PASS |
Mike Jordan
|
|
|
dane Phone #: ###-####
|
BLD-Aging Inspection | 1/31/2008 | 1/31/2008 | 1/31/2008 | | PASS |
Mike Jordan
|
|
|
wip
|