BLD-Final | 5/30/2008 | 6/2/2008 | 6/2/2008 | A | PART |
Mike Jordan
|
|
|
Ron; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt. ok for temp occ. Will be ok for perm occ. once public works and code enforcement has signed perm.
|
BLD-Final | 5/28/2008 | 5/29/2008 | 5/29/2008 | A | NR |
Mike Jordan
|
|
|
ron Phone #: ###-####
|
Code Occupancy Approval Temp | 5/28/2008 | 5/28/2008 | 5/28/2008 | P | DONE |
Scott M.Brown
|
|
|
BOND POSTED FOR LANDSCAPE + $150,359. TEMP SIGNED.
|
BLD-Final | 5/13/2008 | 5/14/2008 | 5/14/2008 | A | CANC |
Mike Jordan
|
|
|
kenny Phone #: ###-####. Cancelled by contractor by phone.
|
BLD-Final | 5/12/2008 | 5/13/2008 | 5/13/2008 | A | CANC |
Jim Storey
|
|
|
kenny Phone #: ###-####//cancelled by Kenny, rescheduled for tommorrow am, called Jim Story and left voice message 9:58 am LEG
|
FIRE-Final Inspection | 5/2/2008 | 5/5/2008 | 5/5/2008 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed. The additional smoke detector outside of the ground floor bedroom has been added.
|
FIRE-Final Inspection | 5/1/2008 | 5/2/2008 | 5/2/2008 | A | FAIL |
Troy Cobbley
|
|
|
Provide a smoke alarm immediatey outside of the bottom floor bedroom as per code and shown on the approved plans. I notified the contractor the the smoke detectors in the second floor corridor will need to be centered on all future apartments. Contractor to provide approved drawing that shows the location of the two new fire hydrants.
|
BLD-Energy code compliance | 2/20/2008 | 2/20/2008 | 2/20/2008 | P | PASS |
Mike Jordan
|
|
|
ron Phone #: ###-####. All framing isues have been resolved. ok to cover.
|
BLD-Framing/Rough-in | 2/15/2008 | 2/19/2008 | 2/19/2008 | A | PART |
Mike Jordan
|
|
|
ron Phone #: ###-####. Need truss engineering. Needs to finish installing clips on 2hr wall, finish nailing off hangars, provide straps, stud shoes were needed. ok to insul.
|
BLD-Framing/Rough-in | 1/17/2008 | 1/18/2008 | 1/18/2008 | A | PART |
Mike Jordan
|
|
|
Kenny; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt. Exterior shear ok.
|
BLD-Energy code compliance | 12/3/2007 | 12/4/2007 | 12/4/2007 | A | PASS |
Mike Jordan
|
|
|
kenny insulation Phone #: ###-####
|
BLD-Foundation | 11/29/2007 | 11/29/2007 | 11/29/2007 | P | PASS |
Mike Jordan
|
|
|
manual Note: foundation wall Phone #: ###-####
|
BLD-Footing | 11/26/2007 | 11/27/2007 | 11/27/2007 | A | PASS |
Mike Jordan
|
|
|
manual Phone #: ###-####. sretback issues resolved. Noted special insp. on site.
|
BLD-Footing | 11/14/2007 | 11/14/2007 | 11/14/2007 | P | PART |
Mike Jordan
|
|
|
dane Phone #: ###-#### Reinforcement ok. setbacks not as per approved plan, contractor to go back and get setbacks approved as is. Also noted special insp. is required.
|