BLD-Final | 8/20/2009 | 8/21/2009 | 8/21/2009 | A | PART |
Mike Jordan
|
|
|
Ray Phone #: ###-####. Temp occ. granted. Will be ok for perm occ once zoning has signed off.
|
BLD-Final | 8/17/2009 | 8/17/2009 | 8/18/2009 | P | NR |
Mike Jordan
|
|
|
Ray Phone #: ###-####
|
FIRE-Final Inspection | 8/5/2009 | 8/7/2009 | 8/7/2009 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed.
|
Code Occupancy Approval Temp | 5/28/2008 | 5/28/2008 | 5/28/2008 | P | DONE |
Scott M.Brown
|
|
|
BOND POSTED FOR LANDSCAPE + $150,359. TEMP SIGNED.
|
BLD-Energy code compliance | 3/24/2008 | 3/24/2008 | 3/24/2008 | P | PASS |
Mike Jordan
|
|
|
ron Phone #: ###-####. ok to cover.
|
BLD-Framing/Rough-in | 3/21/2008 | 3/21/2008 | 3/21/2008 | P | CANC |
Jim Sly
|
|
|
ron Phone #: ###-####
|
BLD-Framing/Rough-in | 3/21/2008 | 3/21/2008 | 3/21/2008 | P | PASS |
Jim Sly
|
|
|
rob Phone #: ###-####
|
BLD-Framing/Rough-in | 3/19/2008 | 3/20/2008 | 3/21/2008 | A | DEFR |
Jim Storey
|
|
|
ron Phone #: ###-#### rolled over out of time to perform insp.
|
BLD-Framing/Rough-in | 2/26/2008 | 2/26/2008 | 2/26/2008 | P | PART |
Mike Jordan
|
|
|
Ron, "shear nail"; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt. Exterior shear only.
|
BLD-Foundation | 12/10/2007 | 12/10/2007 | 12/10/2007 | P | PASS |
Mike Jordan
|
|
|
dane Phone #: ###-####
|
BLD-Footing | 12/5/2007 | 12/5/2007 | 12/5/2007 | P | PART |
Mike Jordan
|
|
|
dane Phone #: ###-####. wip, tying vert. reinforcement in place.
|