BLD-Final | 2/13/2008 | 2/14/2008 | 2/14/2008 | A | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 2/13/2008 at 5:01:14 PM. Contact: ###-####. ok for perm occ.
|
FIRE-Final Inspection | 2/11/2008 | 2/11/2008 | 2/11/2008 | P | PASS |
Troy Cobbley
|
|
|
LIfe safety passed.
|
FIRE-Final Inspection | 2/7/2008 | 2/8/2008 | 2/8/2008 | A | FAIL |
Troy Cobbley
|
|
|
One of the hvac units would not turn on so no fire alarm inspection could be performed. Exit signs and emergency lights tested ok. The thumbturns need to be removed from the front doors with stickers and indicators provided as well.
|
BLD-Other | 1/30/2008 | 1/31/2008 | 1/31/2008 | P | PART |
Mike Jordan
|
|
|
All clips not yet installed, still needs to wire diffuses and security camaras. Will inspect on final.
|
BLD-Other | 1/30/2008 | 1/31/2008 | 1/30/2008 | A | NR |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 1/30/2008 at 9:33:42 AM. Contact: ###-####. Needs code enforcement sign off prior to bldg. final.
|
BLD-Framing/Rough-in | 12/19/2007 | 12/19/2007 | 12/19/2007 | P | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 12/19/2007 at 7:51:10 AM. hardlids.
|
BLD-Framing/Rough-in | 12/14/2007 | 12/14/2007 | 12/14/2007 | P | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 12/14/2007 at 7:15:49 AM. Contact: ###-####. interior walls only. no hardlid.
|
BLD-Conference | 11/6/2007 | 11/7/2007 | 11/7/2007 | A | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 11/6/2007 at 2:43:59 PM. Contact: ###-####.
|