Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD07-02297
StatusFinaled
Name CDI CONTRACTORS
Site Address 430 N MILWAUKEE ST
Project Name 
Customer Number 
ePlanReviewNo
Description
**(Dillards)**(BTS Mall)** To remodel the womens shoe department area of dillards per approved plans. Work to include, removal of the nonbearing partition between stock room and retail area & all related finishes, new work to include reconstruction of partition between storage and retail area, this wall will be reconfigured to add more shoe sales area to floor, relocate storage shoe racks, install new lighting, and miscellaneous related finish work, This building is fully fire sprinkled ANY ALTERATIONS TO THE SPRINKLER SYSTE AND OR ALARM SYSTEM WILL REQUIRE SEPARATE PERMITS. All sprinklers shall be maintained per NFPA #13 as regulated by the fire department. RmH
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/26/200711/27/200711/27/2007APASS
DetailsMike Jordan
don note: EARLY mORNING Phone #: ###-####
DOC - Permit Finaled11/27/200711/27/200711/27/2007PPASS
DetailsMike Jordan
Letter of compliance issued. Verified all sign offs.
FIRE-Final Inspection11/21/200711/26/200711/26/2007APASS
DetailsTroy Cobbley
life safety passed
FIRE-Final Inspection11/20/200711/21/200711/21/2007AFAIL
DetailsTroy Cobbley
Per the general contractor the needed a/v devices did not arrive via UPS as desired. Inspection is to be rescheduled.
FIRE-Final Inspection11/19/200711/20/200711/20/2007AFAIL
DetailsTroy Cobbley
The project related fire alarm permit needs finaled first.
FIRE-Final Inspection11/16/200711/19/200711/19/2007AFAIL
DetailsTroy Cobbley
The project related fire alarm permit needs finaled first.
FIRE-Final Inspection10/30/200710/30/200710/30/2007PFAIL
DetailsTroy Cobbley
A fire alarm permit is required for the work performed to accomodate the new wall layout. Strobes are overspaced in the shoe storage area and not mounted at the correct heights.
BLD-Framing/Rough-in10/11/200710/12/200710/12/2007APASS
DetailsMike Jordan
don Phone #: ###-####. Steel stud interior non load bearing walls, phase 2.
BLD-Framing/Rough-in9/21/20079/24/20079/24/2007APART
DetailsMike Jordan
don Phone #: ###-####. Interior framed wall for new shoe display. ok, (phase 1)
BLD-Conference9/17/20079/18/20079/18/2007ADONE
DetailsMike Jordan
darren Phone #: ###-####