BLD-Final | 4/11/2008 | 4/14/2008 | 4/14/2008 | A | PASS |
Jim Sly
|
|
|
mike Phone #: ###-#### OK for Perm Occ. :)
|
BLD-Final | 4/9/2008 | 4/10/2008 | 4/10/2008 | A | PART |
Jim Sly
|
|
|
mike Phone #: ###-#### OK for Temp Occ. OK for Perm when Public Works signs off........
|
FIRE-Final Inspection | 4/8/2008 | 4/9/2008 | 4/9/2008 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed.
|
Code Occupancy Approval | 4/9/2008 | 4/9/2008 | 4/9/2008 | P | PASS |
Carol Montgomery
|
|
|
Meets compliance with plans. Signed Final.
|
BLD-Other | 2/1/2008 | 2/1/2008 | 2/1/2008 | P | PART |
Jim Sly
|
|
|
mike Phone #: ###-#### Draftstop OK except for soffit areas and door.
|
BLD-Energy code compliance | 1/29/2008 | 1/29/2008 | 1/29/2008 | P | PASS |
Jim Sly
|
|
|
mike - insulation Phone #: ###-####
|
BLD-Framing/Rough-in | 1/28/2008 | 1/28/2008 | 1/28/2008 | P | PART |
Jim Sly
|
|
|
mike Phone #: ###-#### OK to insulate and rock lid to draftstop.....re-call to inspect draftstop and door. Check all fire blocking
|
BLD-Framing/Rough-in | 1/4/2008 | 1/4/2008 | 1/4/2008 | P | PART |
Jim Sly
|
|
|
mike Phone #: ###-#### Shear and roof OK.
|
BLD-Footing | 11/29/2007 | 11/29/2007 | 11/29/2007 | P | PASS |
Jim Sly
|
|
|
alpine const. - rebar Phone #: ###-#### Slab reinforcement OK....insulation on stem wall OK
|
BLD-Footing | 11/13/2007 | 11/13/2007 | 11/13/2007 | P | PASS |
Tom Arcoraci
|
|
|
mike - rebar Phone #: ###-####
|
BLD-Other | 11/8/2007 | 11/9/2007 | 11/9/2007 | A | PASS |
Mike Jordan
|
|
|
mike Note: rebar in foundation Phone #: ###-#### perimeter footing ok.
|