BLD-Final | 11/4/2008 | 11/5/2008 | 11/5/2008 | A | PASS |
Jim Storey
|
|
|
jamie - re-inspection Phone #: ###-####
|
BLD-Final | 10/31/2008 | 11/3/2008 | 11/3/2008 | A | FAIL |
Jim Storey
|
|
|
jamie Phone #: ###-#### fire door closers and smoke seals/ ada sevice counter drawing
|
FIRE-Final Inspection | 10/30/2008 | 10/31/2008 | 10/31/2008 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed.
|
FIRE-Final Inspection | 10/20/2008 | 10/23/2008 | 10/23/2008 | P | FAIL |
Troy Cobbley
|
|
|
Provide the city approved review comments, repair the exit signs, test the emergency lights, provide the correct sample tubes for the duct smoke detectors, position correctly and provide manometer testing. provide building address, provide the permanent doors and hardware
|
BLD-Energy code compliance | 9/2/2008 | 9/3/2008 | 9/4/2008 | A | PART |
Jim Storey
|
|
|
jamie - insulation Phone #: ###-#### lower floor walls ok
|
BLD-Energy code compliance | 9/2/2008 | 9/2/2008 | 9/2/2008 | P | PART |
Jim Storey
|
|
|
jamie - insulation Phone #: ###-#### air seal ok/ fire blk ok
|
BLD-Framing/Rough-in | 9/2/2008 | 9/2/2008 | 9/2/2008 | P | PASS |
Jim Storey
|
|
|
jamie Phone #: ###-####
|
BLD-Energy code compliance | 9/2/2008 | 9/2/2008 | 9/2/2008 | P | PART |
Jim Storey
|
|
|
jamie Phone #: ###-#### chalking ok
|
BLD-Framing/Rough-in | 8/29/2008 | 8/29/2008 | 8/29/2008 | P | PASS |
Jim Storey
|
|
|
Jamie Phone #: ###-####
|
BLD-Framing/Rough-in | 7/10/2008 | 7/14/2008 | 7/14/2008 | A | PART |
Jim Storey
|
|
|
Jamie Phone #: ###-#### sheer ok
|
BLD-Footing | 5/16/2008 | 5/20/2008 | 5/20/2008 | A | PASS |
Jim Storey
|
|
|
jamie - stemwall Phone #: ###-####
|
BLD-Footing | 5/15/2008 | 5/16/2008 | 5/16/2008 | A | PASS |
Jim Storey
|
|
|
jamie - late morning please Phone #: ###-####
|