BLD-Final | 11/28/2007 | 11/28/2007 | 11/28/2007 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 11/28/2007 at 10:22:44 AM. Contact: ###-####.
|
BLD-Final | 11/26/2007 | 11/27/2007 | 11/27/2007 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 11/26/2007 at 5:10:34 PM. Contact: ###-####. temp ok pending plm final/
|
FIRE-Final Inspection | 11/26/2007 | 11/27/2007 | 11/27/2007 | A | PASS |
Forrest France
|
|
|
All corrections were made as per forrest notes.Per KR
|
BLD-Final | 11/26/2007 | 11/26/2007 | 11/27/2007 | P | CANC |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 11/26/2007 at 8:35:25 AM. Contact: ###-####.
|
FIRE-Final Inspection | 11/26/2007 | 11/26/2007 | 11/26/2007 | P | FAIL |
Forrest France
|
|
|
Provide signage at the main entry/exit door, repair one exit sign and one EM light at the office area entrance, provide one 2A10BC PFE for the 1st floor offices, remove existing fire extinguisher signage at four locations in the warehouse area where no longer applicable, missing one exit discharge light at the west side.
|
FIRE-Conference | 11/14/2007 | 11/14/2007 | 11/15/2007 | P | NH |
Forrest France
|
|
|
Scheduled by a contractor via Hello! on 11/14/2007 at 8:52:15 AM. Contact: ###-####. Called contact three times and left one message, no one available.
|
BLD-Framing/Rough-in | 11/1/2007 | 11/1/2007 | 11/1/2007 | A | PART |
Jim Storey
|
|
|
warehouse wall ok
|