BLD-Aging Inspection | 12/16/2009 | 12/16/2009 | 12/16/2009 | | DONE |
Jim Storey
|
|
|
|
DOC - Permit Expired | 12/16/2009 | 12/16/2009 | 12/16/2009 | P | PASS |
Jim Storey
|
|
|
|
BLD-Footing | 3/7/2008 | 3/10/2008 | 3/10/2008 | A | PASS |
Jim Sly
|
|
|
jeff - after 8:30 please Phone #: ###-#### or ###-#### Looked at small footing at North side of house.....OK per detail.....used 2 part epoxy....advised to fill solid blocking in areas needed for point load transfer ie......Floor joist and Vent.
|
BLD-Framing/Rough-in | 1/16/2008 | 1/16/2008 | 1/16/2008 | P | PASS |
Jim Storey
|
|
|
jeffrey Phone #: ###-####
|
BLD-Framing/Rough-in | 12/6/2007 | 12/7/2007 | 12/7/2007 | A | PASS |
Jim Storey
|
|
|
jeff - early as possible Phone #: ###-#### or ###-#### 1 st phase west bathroom ok for cover.
|
BLD-Framing/Rough-in | 11/27/2007 | 11/29/2007 | 11/29/2007 | P | NR |
Jim Storey
|
|
|
jeff - early afternoon if possible Phone #: ###-#### need other trades signed off for ri
|