BLD-Final | 9/16/2008 | 9/17/2008 | 9/17/2008 | P | PASS |
Dave Hannah
|
|
|
jay Phone #: ###-####ok for perm occ
|
FIRE-Final Inspection | 9/16/2008 | 9/17/2008 | 9/17/2008 | P | PASS |
Forrest France
|
|
|
Locking hardware at the office slider doors has been removed, fire life safety finaled.
|
FIRE-Final Inspection | 7/21/2008 | 7/22/2008 | 7/23/2008 | A | PART |
Forrest France
|
|
|
Pending approved hardware at the office slider doors.
|
FIRE-Final Inspection | 6/30/2008 | 7/1/2008 | 7/1/2008 | A | FAIL |
Forrest France
|
|
|
Noted overspaced fire sprinkler heads, missing ceiling tile, one non-functional exit sign, locking hardware at several office slider doors is not approved, discussed general fire life safety requirements.
|
FIRE-Final Inspection | 6/26/2008 | 6/26/2008 | 6/26/2008 | P | FAIL |
Forrest France
|
|
|
Pending completion of fire alarm system modifications.
|
FIRE-Final Inspection | 6/25/2008 | 6/26/2008 | 6/26/2008 | A | DONE |
Forrest France
|
|
|
Hydro test completed.KR
|
BLD-Final | 5/30/2008 | 6/2/2008 | 6/2/2008 | P | NR |
Dave Hannah
|
|
|
jay Phone #: ###-####
|
FIRE-Final Inspection | 5/30/2008 | 6/2/2008 | 6/2/2008 | A | FAIL |
Troy Cobbley
|
|
|
Project is not ready for inspection. Ceiling tile is missing throughout the entire facility. Exit signs and emergency lights were being repaired/installed while I was there. Occupant load signs had not been addressed yet as well.
|
BLD-Aging Inspection | 1/21/2008 | 1/21/2008 | 1/28/2008 | | PASS |
Dave Hannah
|
|
|
exps on 4/19
|