Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD07-02746
StatusFinaled
Name VERTICAL CONSTRUCTION
Site Address 1501 S FEDERAL WAY Unit: 1ST FL
Project NameVIEW POINT BUSINESS PARK
Customer Number 
ePlanReviewNo
Description
(ROMAN CATHOLIC DIOCESE OF BOISE - VIEW POINT BUILDING - 1ST STORY) This building is NOT fire sprinklered. To remodel a 1,560 square foot area located on the 1st story of a 5 story building. Work is to include alterations to an existing nonrated corridor (i.e. walls and doors with sidelights), interior nonbearing walls, suspended ceilings, and finishes. In addition, to construct an 8 foot high chain link fence to create a 140 square foot area to secure the Information Technology equipment of the Diocese. Egress from this area will be through an existing fire alarm control room and/or telephone equipment room. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final3/20/20083/21/20083/21/2008APASS
DetailsJim Storey
joe - please call 1/2 hr prior to inspection Phone #: ###-####
BLD-Final3/14/20083/17/20083/17/2008PPART
DetailsJim Storey
joe Phone #: ###-#### need reinspection for saftey glazing to be instaled. ok for temp occ.
FIRE-Final Inspection3/13/20083/14/20083/14/2008APASS
DetailsTroy Cobbley
life safety passed
BLD-Framing/Rough-in1/24/20081/25/20081/25/2008APART
DetailsJim Storey
joe Note: call prior to inspection Phone #: ###-#### ok pending others/