Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD07-02748
StatusFinaled
Name VERTICAL CONSTRUCTION
Site Address 1501 S FEDERAL WAY Unit: 5TH FL
Project NameVIEW POINT BUSINESS PARK
Customer Number 
ePlanReviewNo
Description
(ROMAN CATHOLIC DIOCESE OF BOISE OFFICE - VIEW POINT BUILDING - 5TH STORY) This building is not fire sprinklered. To remodel the 6,370 square foot 5th story of a 5 story building for an office tenant. Work is to include interior nonbearing walls, interior doors with sidelights, a folding partition, millwork, and finishes. The folding partition will be supported by a steel beam and by 2 steel columns. Lateral bracing will be provided to the roof above. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final3/20/20083/21/20083/21/2008APASS
DetailsJim Storey
joe - please call 1/2 hr prior to inspection Phone #: ###-####
BLD-Final3/14/20083/17/20083/17/2008PPART
DetailsJim Storey
joe Phone #: ###-#### need reinspection for saftey glazing to be instaled. ok for temp occ.
FIRE-Final Inspection3/13/20083/14/20083/14/2008APASS
DetailsTroy Cobbley
life safety passed
FIRE-Final Inspection3/13/20083/13/20083/13/2008PNR
DetailsForrest France
Inspection intended to be scheduled for 3/14 per contractor, not ready for final at this time.
BLD-Framing/Rough-in2/1/20082/4/20082/4/2008PPASS
DetailsJim Storey
joe - shaft wall - please call 1/2 hr prior to inspection Phone #: ###-#### core board replacment ok on all three floors of shaft.
BLD-Framing/Rough-in1/24/20081/25/20081/25/2008APART
DetailsJim Storey
joe Note: call prior to inspection Phone #: ###-#### ok pending others/ shaft wall penatrations need insp. latter.