BLD-Final | 4/28/2008 | 4/28/2008 | 4/28/2008 | P | PASS |
Dave Hannah
|
|
|
Henry\\customer says this space is 260, we have space 100 can you verify?? Phone #: ###-#### ok fo r perm occ
|
BLD-Final | 4/21/2008 | 4/22/2008 | 4/23/2008 | P | PART |
Dave Hannah
|
|
|
henry Phone #: ###-#### ok for temp occ needs other trades to go perm
|
FIRE-Final Inspection | 4/22/2008 | 4/22/2008 | 4/22/2008 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed.
|
FIRE-Final Inspection | 4/21/2008 | 4/22/2008 | 4/22/2008 | A | NR |
Forrest France
|
|
|
Items on issued correction notice are not yet completed for reinspection per contractor. Final rescheduled for late afternoon per conversation.
|
BLD-Final | 4/18/2008 | 4/21/2008 | 4/22/2008 | P | CANC |
Dave Hannah
|
|
|
henry Phone #: ###-####
|
FIRE-Final Inspection | 4/21/2008 | 4/21/2008 | 4/21/2008 | P | FAIL |
Forrest France
|
|
|
Missing suite address numbers, provide max. occupant load signs per review notes, provide approved door hardware at the balcony/patio doors, missing EM lighting and exit signs at various locations, provide signage at the door the the fire riser room, remove the curtain blocking the SE kitchen exit door, storage at the kitchen areas to remain below 18" from the sprinkler deflector.
|
BLD-Framing/Rough-in | 4/11/2008 | 4/14/2008 | 4/14/2008 | P | PART |
Dave Hannah
|
|
|
for ceiling grid--henry Phone #: ###-#### ok to cover ceiling
|
BLD-Framing/Rough-in | 4/1/2008 | 4/1/2008 | 4/2/2008 | P | PART |
Dave Hannah
|
|
|
ceiling grid//Henry Phone #: ###-####
|
BLD-Framing/Rough-in | 3/27/2008 | 3/27/2008 | 3/27/2008 | P | FAIL |
Jim Storey
|
|
|
henry - ceiling grid Phone #: ###-#### have arch adress ceilling to comply with cicsi 636.
|
BLD-Framing/Rough-in | 2/7/2008 | 2/7/2008 | 2/7/2008 | P | PASS |
Dave Hannah
|
|
|
talon Note: late afternoon please Phone #: ###-#### ok to cover walls after elec oks rough in
|