BLD-Final | 2/24/2009 | 2/25/2009 | 2/25/2009 | A | PASS |
Dave Hannah
|
|
|
Joey- call for access Phone #: ###-####
|
DOC - Permit Finaled | 2/25/2009 | 2/25/2009 | 2/25/2009 | P | PASS |
Dave Hannah
|
|
|
|
Code Occupancy Approval | | | 8/28/2008 | | FAIL |
|
|
|
Upon my inspection of the site on Wednesday August 27, 2008, a number of the Conditions of Approval have not been met and the buildings that were approved do not match what has been constructed on the site. As such, I am unable to allow you occupancy to these four residential dwellings at this time.
Please see occupancy denial letter in the documents section.
|
BLD-Energy code compliance | 4/28/2008 | 4/28/2008 | 4/28/2008 | P | PASS |
Dave Hannah
|
|
|
joey Phone #: ###-####
|
BLD-Framing/Rough-in | 4/21/2008 | 4/21/2008 | 4/21/2008 | P | PASS |
Jim Sly
|
|
|
joey Phone #: ###-####
|
BLD-Framing/Rough-in | 4/16/2008 | 4/17/2008 | 4/16/2008 | A | PART |
Dave Hannah
|
|
|
joey Phone #: ###-#### sheet rock on eves both house and garage ok to cover
|
BLD-Foundation | 2/14/2008 | 2/19/2008 | 2/19/2008 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 2/14/2008 at 9:39:41 AM. Contact: ###-####.
|
BLD-Footing | 2/14/2008 | 2/15/2008 | 2/15/2008 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 2/14/2008 at 9:39:15 AM. Contact: ###-####.
|