Code Occupancy Approval | | | 9/26/2008 | | PASS |
Wm. Michael Meloy
|
|
|
|
FIRE-Final Inspection | 9/23/2008 | 9/24/2008 | 9/24/2008 | A | PASS |
Forrest France
|
|
|
Fire life safety passed.
|
BLD-Final | 9/23/2008 | 9/24/2008 | 9/24/2008 | P | PASS |
Dave Hannah
|
|
|
craig Phone #: ###-#### ok for perm occ after code enforcement finals
|
BLD-Framing/Rough-in | 6/26/2008 | 6/27/2008 | 6/27/2008 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 6/26/2008 at 10:42:11 AM. Contact: ###-####.
|
BLD-Conference | 6/19/2008 | 6/20/2008 | 6/20/2008 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 6/19/2008 at 3:38:40 PM. Contact: ###-####.
|
BLD-Footing | 3/20/2008 | 3/20/2008 | 3/21/2008 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 3/19/2008 at 3:33:57 PM. Contact: ###-####. bridge ftg ok
|
BLD-Footing | 3/19/2008 | 3/20/2008 | 3/20/2008 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 3/19/2008 at 3:33:57 PM. Contact: ###-####. boat dock south end ok to pour
|