Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD07-02883
StatusFinaled
Name GENTHER MASONRY INC
Site Address 810 S VISTA AVE
Project NameVISTA VILLAGE
Customer Number 
ePlanReviewNo
Description
(BODYRENEW - VISTA VILLAGE SHOPPING CENTER - NORTH END) The fire sprinkler system is used for fire area and building area increase. To construct a 3,004 square foot exercise facility within an existing 8,260 square foot, one story building. Work is to include 2 restrooms accessible to the disabled, 1 dressing room accessible to the disabled, interior nonbearing walls, interior doors, suspended acoustical ceilings, gypsum board ceilings, and finishes. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final3/31/20084/1/20084/1/2008APASS
DetailsJim Storey
Jim, The smoke seal is installed, the label for the fire rated door is on, and the occupancy sign is right inside the front door. If you have anything else, please let me know. I don''t think that the space actually is unlocked until 10AM. So you can hit it later in the morning if that works. Thanks,
Todd Phone #: ###-#### Internet Inspection Request from: Todd Kurns card on site final ok.
BLD-Final3/26/20083/26/20083/26/2008PFAIL
DetailsJim Storey
JIm, I need to get Forest to sign me off on fire life safety before you can final the project. Call me when you are on your way. Thanks,
rated door labled and smoke seals/ occ load sign.
Todd Phone #: ###-#### Internet Inspection Request from: Todd Kurns
FIRE-Final Inspection3/26/20083/26/20083/26/2008APASS
DetailsForrest France
Fire life safety is acceptable pending address numbers and max. occupant load sign are posted today as agreed and completed prior to structural final.

BLD-Other2/20/20082/22/20082/22/2008APASS
DetailsTom Arcoraci
Acoustical Ceiling Inspection Phone #: ###-#### Internet Inspection Request from: Todd Kurns
BLD-Framing/Rough-in1/23/20081/25/20081/25/2008APART
DetailsJim Storey
jim, Just a simple framing inspection. talk to you on friday.

Todd Phone #: ###-#### Internet Inspection Request from: Todd Kurns framing ok pending others.