Permit Information
Permit NumberBLD07-02921
StatusFinaled
Name IND SCHOOL DIST
Site Address 300 W FORT ST
Project NameFORT BOISE MIDDLE HIGH
Customer Number 
ePlanReviewNo
Description
(Fort Boise Middle School) (Seismic improvements) To remove an existing brick chimney to approximately 4' higher than the existing roof, structurally support as shown on plans repair roofing, remove cantilevered concrete canopies at each entry, the existing flue will be replaced with a positive pressure flue on the boiler. The existing water heater will be replaced with a new water heater and a separate PVC combustion of flue piping as required by design per note on plan sheet A101, all materials are to be properly disposed of. RmH
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final9/3/20089/5/20089/5/2008APASS
DetailsDave Hannah
Caleb Phone #: ###-####
DOC - Permit Finaled9/5/20089/5/20089/5/2008PPASS
DetailsDave Hannah