BLD-Final | 4/17/2008 | 4/17/2008 | 4/17/2008 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 4/17/2008 at 10:00:40 AM. Contact: ###-####.
|
FIRE-Final Inspection | 4/17/2008 | 4/17/2008 | 4/17/2008 | P | PASS |
Forrest France
|
|
|
Life safety completed. KR
|
FIRE-Conference | 3/18/2008 | 3/19/2008 | 3/20/2008 | A | DONE |
Forrest France
|
|
|
On site conference regarding sprinkler system modifications necessary due to ductwork obstructions.
|
BLD-Framing/Rough-in | 3/13/2008 | 3/13/2008 | 3/13/2008 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 3/13/2008 at 9:24:21 AM. Contact: ###-####. sprinkler modifation under duct work over 48 inches will be required per chapter 9.
|