BLD-Final | 2/1/2008 | 2/1/2008 | 2/1/2008 | P | PASS |
Jim Storey
|
|
|
arron - late afternoon please Phone #: ###-####
|
DOC - Permit Finaled | 2/1/2008 | 2/1/2008 | 2/1/2008 | P | PASS |
Jim Storey
|
|
|
|
BLD-Final | 1/31/2008 | 2/1/2008 | 2/1/2008 | A | FAIL |
Jim Sly
|
|
|
aaron Phone #: ###-#### C/N posted......Verify Code Enf finaled, Non conforming temporary step at front entry.......... Determine which door is req egress door.....and meet all req.per R-311.1, 2, and 3. Handrails... and min 4" at risers....rear stairway.
|
Code Occupancy Approval | 2/1/2008 | 2/1/2008 | 2/1/2008 | P | PASS |
Joe R Venneman
|
|
|
Landscaping bid approved and matches requirements of this permit
|
Code Occupancy Approval Temp | | | 2/1/2008 | | DONE |
|
|
|
Landscaping bond submitted and meets requirements of the permit.
|
BLD-Final | 1/30/2008 | 1/30/2008 | 1/30/2008 | P | NR |
Mike Jordan
|
|
|
aaron Phone #: ###-####. Called aaron and told him that he needed a code enforcement sign off first, prior to bldg. final.
|
BLD-Conference | 12/31/2007 | 1/2/2008 | 1/2/2008 | A | PASS |
Jim Storey
|
|
|
aaron - cover Phone #: ###-#### soffit rock
|
BLD-Energy code compliance | 12/31/2007 | 12/31/2007 | 12/31/2007 | P | PART |
Tony Young
|
|
|
aaron - cover Phone #: ###-#### ok to sheetrock
|
BLD-Framing/Rough-in | 12/28/2007 | 12/28/2007 | 12/28/2007 | P | PASS |
Mike Jordan
|
|
|
Aaron, ###-####
|
BLD-Foundation | 12/10/2007 | 12/11/2007 | 12/11/2007 | P | PASS |
Jim Storey
|
|
|
bill Phone #: ###-####
|
BLD-Footing | 12/7/2007 | 12/7/2007 | 12/7/2007 | P | PASS |
Jim Storey
|
|
|
Aaron ###-####
|