BLD-Final | 8/13/2008 | 8/13/2008 | 8/13/2008 | P | PASS |
Dave Hannah
|
|
|
lon Phone #: ###-#### ok for perm occ
|
BLD-Final | 7/21/2008 | 7/21/2008 | 7/22/2008 | P | PART |
Dave Hannah
|
|
|
ok for temp occ need closures on 90 min doors
|
BLD-Final | 7/18/2008 | 7/21/2008 | 7/21/2008 | A | DEFR |
Dave Hannah
|
|
|
Rescheduled due to issues with Fire Final Phone #: ###-#### Internet Inspection Request from: Ron Oswald
|
FIRE-Final Inspection | 7/18/2008 | 7/21/2008 | 7/21/2008 | A | PASS |
Forrest France
|
|
|
Noted deficiencies repaired, fire life safety finaled.
|
FIRE-Final Inspection | 7/17/2008 | 7/18/2008 | 7/18/2008 | A | FAIL |
Forrest France
|
|
|
Provide building address, provide approved hardware at both sets of horizontal slider exit doors per review notes, repair one EM light and install one missing EM light, also need to complete project related fire sprinkler permit correction notice prior to final life safety approval.
|
BLD-Final | 7/16/2008 | 7/18/2008 | 7/18/2008 | P | CANC |
Dave Hannah
|
|
|
Phone #: ###-#### Internet Inspection Request from: Ron Oswald Inspection cancelled from web by: Ron Oswald
|
FIRE-Final Inspection | 7/16/2008 | 7/17/2008 | 7/17/2008 | A | NR |
Forrest France
|
|
|
The project related fire sprinkler permit must be requested for final inspection/approval prior to building fire life safety final.
|
BLD-Framing/Rough-in | 6/30/2008 | 6/30/2008 | 6/30/2008 | P | PART |
Dave Hannah
|
|
|
This is for ceiling Grid inspection/ Electrical has passed for cover. Thanks Phone #: ###-#### Internet Inspection Request from: Ron Oswald ok to cover after other trades ok
|
BLD-Framing/Rough-in | 5/6/2008 | 5/7/2008 | 5/7/2008 | A | PASS |
Dave Hannah
|
|
|
Hard lid inspections for building a of 252 and hard lid for bathrooms building b of 252 Thanks Phone #: ###-#### Internet Inspection Request from: Ron Oswald
|
BLD-Framing/Rough-in | 4/29/2008 | 4/30/2008 | 5/1/2008 | P | PART |
Dave Hannah
|
|
|
This is a partial hard lid inspection for the west end of the building. Thanks Ron Phone #: ###-#### Internet Inspection Request from: Ron Oswald hard lids ok to cover
|
BLD-Energy code compliance | 4/21/2008 | 4/22/2008 | 4/22/2008 | A | PASS |
Dave Hannah
|
|
|
Glad this is online now. Phone #: ###-#### Internet Inspection Request from: Ron Oswald
|
BLD-Framing/Rough-in | 3/18/2008 | 3/19/2008 | 3/19/2008 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 3/18/2008 at 1:39:21 PM. Contact: ###-####. ok to cover int walls all but for plumbing walls
|