Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD07-03069
StatusFinaled
Name LARRONDO BUILDERS LLC
Site Address 422 E CAVE CT
Project Name 
Customer Number 
ePlanReviewNo
Description
To construct a single story single family dwelling that is 2783 sq.ft. with a 1013 sq.ft. attached garage, 64 sq.ft. covered front entryway, and a 216 sq.ft. covered rear patio. This lot is within the hillside area and is subject to the hillside ordinances. A class "A" roof system and defensible area will be maintained. HILLSIDE FOUNDATION DESIGNS. Dwellings; townhouse units; additions to same and detached structures constructed in areas falling under the purview of the "Boise City Hillside Ordinance", shall have foundation designs signed and sealed by a professional engineer licensed by the State of Idaho, and qualified in the engineering specialty involved. (Boise City Code 4-02-44) Approval is based on approved plans, redlinning, engineering, soils report, rescheck, and plan review report. Zoning approval by Sue Hansen as a R-1A.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final3/8/20103/8/20103/8/2010PPASS
DetailsTony Young
BLD-Final3/8/20103/8/20103/8/2010APASS
DetailsTony Young
dave Phone #: ###-####
DOC - Permit Finaled3/8/20103/8/20103/8/2010PPASS
DetailsTony Young
c of o issued
BLD-Final3/4/20103/5/20103/8/2010ACANC
DetailsTony Young
dave Phone #: ###-####
BLD-Grading Inspection2/18/20102/18/20102/18/2010ADONE
DetailsTerry Records
Final grading and drainage approved.
BLD-Aging Inspection2/3/20102/3/20102/8/2010 PEND
DetailsTony Young
waiting still for other finals
BLD-Final2/3/20102/4/20102/4/2010ANR
DetailsTony Young
Dave Kallas- Call 30 mins prior to going Phone #: ###-####
called,, left messege,, needs hillside 1st
BLD-Final8/10/20098/11/20098/11/2009ANR
DetailsTony Young
scott - please call for access Phone #: ###-####
cxalled and left message,, need hill side, and mech final,, no inspection made
BLD-Framing/Rough-in11/4/200811/4/200811/4/2008PPASS
DetailsTony Young
scott Phone #: ###-####
BLD-Energy code compliance11/4/200811/4/200811/4/2008PPASS
DetailsTony Young
scott Phone #: ###-####
ok to cover now
BLD-Energy code compliance10/31/200810/31/200810/31/2008PPART
DetailsTony Young
pat Phone #: ###-####
insulation will be good after frame passes
BLD-Framing/Rough-in10/30/200810/31/200810/31/2008AFAIL
DetailsTony Young
pat Phone #: ###-####
still need fire blocks at f/place and range vent chase
BLD-Framing/Rough-in10/22/200810/23/200810/23/2008PFAIL
DetailsDave Hannah
scott Phone #: ###-#### c/n on site ok to insulate
BLD-Foundation6/24/20086/25/20086/25/2008PPART
DetailsTony Young
Scheduled by a contractor via Hello! on 6/24/2008 at 2:29:51 PM. Contact: ###-####.
wip,, ftg sub grade verbaly ok per Terry records
BLD-Footing6/24/20086/24/20086/25/2008PPART
DetailsTony Young
Scheduled by a contractor via Hello! on 6/24/2008 at 9:09:21 AM. Contact: ###-####.
still need stamped soil report